Sedalia Liberty Park Connect Project
Sector: Water Supply and Storage • Location: Sedalia, Missouri, United States of America
Source: Dodge
The work consists of the construction of a 8-10 wide sidewalk beginning at the Katy Depot continuing west along the south side of 3rd Street to a mid-block crossing at Sneed Avenue. Tasks include: Demolition, Earthwork, Grading, Storm Sewer, Concrete Sidewalk, ADA Ramps, Signage, Pavement Markings, Traffic Control, and Erosion Control.
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Government, Road, Waste Processing and Treatment, Commercial, Car parking, Automotive
- Location
- Sedalia, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Sedalia Liberty Park Connect Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work consists of the construction of a 8-10 wide sidewalk beginning at the Katy Depot continuing west along the south side of 3rd Street to a mid-block crossing at Sneed Avenue. Tasks include: Demolition, Earthwork, Grading, Storm Sewer, Concrete Sidewalk, ADA Ramps, Signage, Pavement Markings, Traffic Control, and Erosion Control. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Sedalia |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Road, Waste Processing and Treatment, Commercial, Car parking, Automotive |
Article published date | 2025-09-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
