Sedco MDP Line C
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
This City of Wildomar-led (City) project proposes to construct a 36-inch storm drain located on Sedco Boulevard between Lakeview Terrace and Mission Trail that will convey 100-year flows and alleviate street flooding. The City will be responsible for operation and maintenance of the facility. This project is funded as a cost share between the District and City
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial
- Location
- Lake Elsinore, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Sedco MDP Line C
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | This City of Wildomar-led (City) project proposes to construct a 36-inch storm drain located on Sedco Boulevard between Lakeview Terrace and Mission Trail that will convey 100-year flows and alleviate street flooding. The City will be responsible for operation and maintenance of the facility. This project is funded as a cost share between the District and City |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Lake Elsinore |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
