logo
ProjectPlanning Schematics

Sedona Mixed Use

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Mixed-use development containing forty (40) residential units and approximately 1700 square feet of total commercial space on a 0.94-acre parcel with frontage along Meridian Ave E (SR-161). The project consists of one (1) four-story mixed-use commercial and multi-family building and one (1) three-story multi-family building with associated site improvements, including open space, parking, landscap

Status
Prospective
Sector
Manufacturing (Industrial), Residential, Commercial, Car parking, Power Transmission, Power Generation (CCGT), Automotive
Location
Edgewood, Washington, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Sedona Mixed Use

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Sedona Mixed Use” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Edgewood, Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Mixed-use development containing forty (40) residential units and approximately 1700 square feet of total commercial space on a 0.94-acre parcel with frontage along Meridian Ave E (SR-161). The project consists of one (1) four-story mixed-use commercial and multi-family building and one (1) three-story multi-family building with associated site improvements, including open space, parking, landscaping, and utilities.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Edgewood

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Residential, Commercial, Car parking, Power Transmission, Power Generation (CCGT), Automotive

Article published date

2024-11-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project