logo
ProjectCompleted

SEF Akmeat

Completed · Bosnia and Herzegovina

Source: International Finance Corporation (IFC)

Environmental Review Summary (ERS)Project Name: BOSNIA & HERZEGOVINA-AkmeatRegion: EuropeSector: Food and AgribusinessProject No.: 008336 1. This project involves the rehabilitation and refurbishing of an existing building which has been damaged by the war, for use as a meat processing plant. Production capacity will be 3,000 tpa of fresh and frozen meats (poultry, beef and lamb) and pr

Status
Closed
Sector
Oil and Gas, Hydrogen, Biomass, Water Supply and Storage, Forest Products and Packaging, Consumer Products, Government, Manufacturing (Industrial), Waste Processing and Treatment, Commercial
Location
Bosnia and Herzegovina
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about SEF Akmeat

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SEF Akmeat” is an infrastructure initiative in the Oil and Gas sector, located in Bosnia and Herzegovina. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Environmental Review Summary (ERS)Project Name: BOSNIA & HERZEGOVINA-AkmeatRegion: EuropeSector: Food and AgribusinessProject No.: 008336 1. This project involves the rehabilitation and refurbishing of an existing building which has been damaged by the war, for use as a meat processing plant. Production capacity will be 3,000 tpa of fresh and frozen meats (poultry, beef and lamb) and processed meat products (including salami, hot dogs, hamburgers and ham in casings). No slaughtering facility is included. The plant is modeled on similar European operations using the latest meat processing technology. This is a category B project according to IFC''s environmental review procedure because specific impacts may result which can be avoided or mitigated by adhering to generally recognized performance standards, guidelines or design criteria.2. The review of this project consisted of information submitted by the project sponsor and the technical appraisal completed by IFC Europe 1 Department and Agribusiness Department staff. The following potential environmental, health and safety problems of this project were analyzed:· liquid effluents;· solid wastes;· fire prevention and explosion prevention; and · plant hygiene and general employee health and safety.Information as to how these issues will be addressed is summarized below.3. The site is in a small commercial area near to but outside of Sarajevo, amongst other small manufacturing plants and related infrastructure. There are no environmentally-sensitive areas or critical habitat in the area which would be affected by operation of this facility.4. A small steam boiler on the premises is fueled with diesel fuel. Design specifications for air emissions from this boiler meet the specified World Bank guidelines. Smoking chambers for smoked products are used on an intermittent basis and produce only minor emissions. The stacks are fitted with filters to minimize any particulate release.5. Process waste water will contain small amounts of meat products producing elevated levels of BOD and oil and grease, along with detergent residues from cleaning. The plant provides preliminary physical treatment of the waste, and effluent wastewater quality meets local and national standards. The wastewater quality meets World Bank requirements for discharge to a central wastewater treatment system, but is slightly in excess of guidelines (for BOD and oil and grease) for discharge to surface waters. The wastewater is currently discharged to a sewer system for downstream treatment at the Sarajevo treatment facility. This wastewater treatment plant was also damaged during the war, and is currently being repaired and expected to be returned to full operation within two years. In the event that the Sarajevo treatment plant is not returned to operation within this period, the sponsor will provide additional upgrading of the existing on-site treatment to ensure that the liquid effluent complies with World Bank requirements.6. The plant is operated to minimize the amount of solid waste produced and to ensure that maximum use is made of all food product being processed. Organic wastes are sold to a rendering operation, packaging and cardboard waste is disposed of in an approved municipal disposal facility, and any water treatment sludge is handled by the municipal waste company.7. Cold storage and freezing facilities will use ammonia as the refrigerant. An alarm system for ammonia release in case of leakage or accident will be installed. Other hazardous materials, including acidic and caustic detergents, will be properly stored and handled to minimize risks of accidents. Diesel fuel storage tanks will be bermed to protect against accidental spills and leakage.8. Noise in the workplace will be minimized through the use of baffles and silencers on equipment as needed. Little ambient noise will be produced beyond the boundaries of the plant. Machinery will be properly protected to prevent accidents and all electrical systems grounded. Fire alarm and protection systems are provided, including a sprinkler system.9. The plant will be operated to international standards of hygiene. Workers are provided with personal protective equipment as required. First aid stations are provided at locations in the plant. A detailed emergency response plan will be prepared in cooperation and coordination with local authorities. Training is provided to staff in hygiene and sanitation and good manufacturing practices. The sponsor is developing a written environmental policy for this operation. The technical/production manager is designated with responsibility for oversight of environmental issues.10. IFC will ensure ongoing compliance with World Bank environmental, health and safety policies and guidelines during the life of the project by evaluating monitoring reports submitted annually to IFC by the sponsor and by conducting periodic supervision.11. Based on its review of available information regarding potential environmental impacts and proposed mitigation measures, IFC concludes that this proposed project is designed to meet World Bank environmental, health and safety policies and guidelines as well as host country requirements.

Original sector

AG - Animal Slaughtering and Processing

Location

Country

Bosnia and Herzegovina

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Oil and Gas, Hydrogen, Biomass, Water Supply and Storage, Forest Products and Packaging, Consumer Products, Government, Manufacturing (Industrial), Waste Processing and Treatment, Commercial

Article published date

2025-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project