SEF Asia Granite Processing Project
The status, timeline and source of this project. A free account opens every field.
Source: International Finance Corporation (IFC)
Summary Of Project Information (SPI)Project Name:Uzbekistan: Asia Granite Processing ProjectRegion:Central Asia, Middle East and North Africa Sector:Project No:009582Projected Board Date:June 15, 1999Company Name:Asia GraniteTechnical Partner and/or Major Shareholders The Project will be owned and operated by Asia Granite (the Company). The company will be a joint venture between Strokiomplect Ser
- Status
- Closed
- Sector
- Waste Processing and Treatment, Biomass, Water Supply and Storage, Government, Rail, Commercial, Manufacturing (Industrial)
- Location
- Uzbekistan
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about SEF Asia Granite Processing Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Summary Of Project Information (SPI)Project Name:Uzbekistan: Asia Granite Processing ProjectRegion:Central Asia, Middle East and North Africa Sector:Project No:009582Projected Board Date:June 15, 1999Company Name:Asia GraniteTechnical Partner and/or Major Shareholders The Project will be owned and operated by Asia Granite (the Company). The company will be a joint venture between Strokiomplect Service Limited (SKS) and Podemnik Joint Stock Company (Podemnik) with 53% and 47% of the shares respectively. SKS is an established local marble processing company and will manage the Project. Podemnik will contribute in-kind assets comprising land, building and associated infrastructure and will be a passive partner.Project Cost Including proposed IFC investment Estimated Project Cost: US$7 millionIFC is expected to provide an SEF loan of US$ 2.5 million Location of project and Description of site The project is to be located in Tashkent City. The project will be housed in a building constructed in 1996, with a covered area of 7,500 square meters and 8,500 square meters of adjoining land. The facility also includes a water filter plant with a capacity of 200 cubic meters. The facility also has access to a railroad spur to be used for delivery of raw materials. Description of Company and Purpose of Project The project involves setting up a granite processing plant in an existing building in Tashkent, Uzbekistan. The project is expected to produce 45,000 square meters per year of granite tiles plus 2,000 linear meters per year of granite slabs used for flooring, cladding and staircases. 60% production from the granite plant is expected to be sold domestically, while the remaining 40% is to be exported.The project will improve and enhance local production capacities of the construction industry and bring them to international standard. Indigenous production of granite tiles and slabs will add value to local raw materials, will substitute for imports, earn foreign exchange through exports and will provide employment to 38 people.Environmental Category and Issues This is a category B project. Environmental and social key issues include: raw materials source, site location and land use; air emissions; wastewater effluents; solid waste management; fuel storage and handling; fire protection and emergency response; and general worker health and safety. All process activities emitting dust will be performed under wet conditions to minimize the generation of air emissions. In addition, Asia Granite will also install indoor dust filters and will perform periodic monitoring of the workplace air quality. All process waters generated will be filtered and recirculated back into the process and the domestic waters will be collected and sent to the local authorities for treatment. Industrial solid residues will be sold for reuse. Non recyclable residues will be transported and appropriately disposed. There will be a responsible in charge of implementing the environmental, health and safety measures and of establishing Fire Safety and Occupational Health and Safety programs. Based on its review of available information regarding potential environmental impacts and proposed mitigation measures, IFC concludes that the proposed project is being designed to meet Government of Uzbekistan requirements, and World Bank policies, and environmental, health and safety guidelines.The is from the InfoShop.Date SPI sent to InfoShop: May 11, 1999“This Summary of Project Information is prepared and distributed to the public in advance of consideration of the proposed transaction by the Corporation’s Board of Directors. It is provided for the purpose of enhancing the transparency of IFC’s activities and should not be construed as presuming the outcome of IFC Board consideration.”For Additional Information contact: Corporate Relations Unit -telephone: (202) 473-7711facsimile: (202) 974-4384Environmental documents for this project are available at http://www.ifc.org and from the World Bank InfoShop (http://www.worldbank.org/html/pic/aboutinfo.html). |
Original sector | BA - Bricks and Other Clay Products |
Location
Country | Uzbekistan |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Biomass, Water Supply and Storage, Government, Rail, Commercial, Manufacturing (Industrial) |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Uzbekistan
- UZBEKISTAN WATER FRAMEWORK LOAN
- Tashkent water improvement contract
- Bukhara & Samarkand water supply project
- Uzbekistan: Karakalpakstan and Khorezm Water Supply and Sanitation Project
- Skills Development for a Modern Economy Project
- Uzbekistan: Karakalpakstan and Khorezm Local Roads Network Reconstruction Project
- Uzbekistan: CEEC Uzbekistan BESS Green Loan
- Uzbekistan: Bukhara Region Water Supply and Sewerage Phase II (BRWSSP II)