logo

SEF Distribuidora Cesar Guerrero S.A.

Sector: Raw Materials • Location: Nicaragua

Source: International Finance Corporation (IFC)

Project
Completed

Summary Of Project Information (SPI)Project NameNicaragua - DICEGSA     RegionLatin America and CaribbeanSectorProject No008994Projected Board DateJuly 18, 1998Company NameDICEGSA, S.A. and CEGUEL, S.A. Technical Partner and/or Major Shareholders The Company is owned by the Guerrero family of Nicaragua. Project Cost Including proposed IFC investment US$2.6 million. IFC is contributing US$1.3 mill

Project Information FAQ

Project Information

4 Q
The project “SEF Distribuidora Cesar Guerrero S.A.” is an infrastructure initiative in the Raw Materials sector, located in Nicaragua. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Summary Of Project Information (SPI)Project NameNicaragua - DICEGSA     RegionLatin America and CaribbeanSectorProject No008994Projected Board DateJuly 18, 1998Company NameDICEGSA, S.A. and CEGUEL, S.A. Technical Partner and/or Major Shareholders The Company is owned by the Guerrero family of Nicaragua. Project Cost Including proposed IFC investment US$2.6 million. IFC is contributing US$1.3 million in long-term debt (A Loan).Location of project and Description of site The site where the new warehouse and office headquarter complex will be constructed is about a mile from Dicegsa''s current site, which is located in Managua. The site is about 9,000 square meters. The facilities will consist of a one-level 2,300 square meter warehouse, and an 800 square meter two-level office area. Ceguel''s laboratory is located in the outskirts of Granada. It consists of a 1,000 square meter building and 600 square meter warehouse.Description of Company and Purpose of Project Dicegsa is the largest distributor of pharmaceutical goods in Nicaragua. The project consists of constructing a new warehouse and office headquarters complex to expand and modernize Dicegsa''s wholesale distribution operations, and to expand their distribution vehicle fleet. The second component of the project includes the expansion and modernization of Dicegsa''s pharmaceutical production subsidiary, Ceguel S.A., which produces pharmaceuticals that are complementary to Dicegsa''s imported products.Environmental Category and Issues This is a category B project according to IFC''S environmental review procedure. Key environmental, occupational health and safety issues that were of potential concern during IFC''S environmental review of this project included: air emissions; treatment and disposal of process effluent; disposal of pharmaceutical-related waste; disposal of solid, and other liquid wastes, including sewage; source of water and power, including fuel storage if applicable; employee exposure to dust and noise; provision of personal protective equipment; health and safety training for employees; and fire safety. No air emission will be released to the atmosphere. Wastewater treatment will be installed to ensure released waters will comply with World Bank Guidelines. Work environment will be controlled and personal protective equipment will be provided to and required to use by the employees. The plant will have fire emergency systems in place. The project has been designed to comply with World Bank Guidelines and Policies.      The is from the InfoShop.Date SPI sent to InfoShop June 18, 1998“This Summary of Project Information is prepared and distributed to the public in advance of consideration of the proposed transaction by the Corporation’s Board of Directors. It is provided for the purpose of enhancing the transparency of IFC’s activities and should not be construed as presuming the outcome of IFC Board consideration.”For Additional Information contact: Corporate Relations Unit -telephone: (202) 473-7711facsimile: (202) 974-4384Environmental documents for this project are available at http://www.ifc.org and from the World Bank InfoShop (http://www.worldbank.org/html/pic/aboutinfo.html).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data