SEF Durres Cement
Sector: Waste Processing and Treatment • Location: Albania
Source: International Finance Corporation (IFC)
Summary Of Project Information (SPI)Project NameAlbania-SEF Durres Cement RegionEuropeSectorProject No009216Projected Board DateOctober 30, 1998Company NameEurotech Cement Technical Partner and/or Major Shareholders The project sponsor is Eurotech Cement shpk., owned 85% by Halyps and 15% by Miralb Shpk. Halyps is a 94% Greek subsidiary of Ciments Francais, one of the biggest cement produ
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Summary Of Project Information (SPI)Project NameAlbania-SEF Durres Cement RegionEuropeSectorProject No009216Projected Board DateOctober 30, 1998Company NameEurotech Cement Technical Partner and/or Major Shareholders The project sponsor is Eurotech Cement shpk., owned 85% by Halyps and 15% by Miralb Shpk. Halyps is a 94% Greek subsidiary of Ciments Francais, one of the biggest cement producers in the world.Project Cost Including Proposed IFC Investment The project cost is estimated at US$3.5 million. The proposed IFC investment is a loan of US$1.2 million.Location of Project and Description of Site The new cement bagging terminal is three kilometers from the port of Durres, located 35 kilommeters west of Tirana. Description of Company and Purpose of Project The project comprises construction and equipping of a new cement bagging terminal, which will include two storage silos and a cement bagging unit. The bagged and bulk cement will be primarily sold on the domestic market. IFC''s role in the project will include providing long-term financing to the Company in an environment, where private banks are undercapitalized and do not have the capacity to meet companies'' long-term financing needs. Investment in this project will send a powerful signal to other lending institutions about investment opportunities in Albania. IFC will also be providing technical assistance through its review and suggestions in evaluating project design and cost structure. In addition, the project is expected to have a positive developmental impact. It will create 40 new direct jobs and raise skill levels since no other production facility in Albania uses the modern technology, which the company intends to use. Durres Cement will also contribute to the development of distribution, wholesale and retail chains in the Durres/Tirana corridor, increase competition in the construction materials market, and benefit customers from improved product quality for, possibly, lower price. Environmental Category and Issues This is a category B project according to IFC''s environmental review procedures. Air emissions will be controlled by dust collectors. The wastewater will be discharged to the municipal sewage system, and health and safety measures will be properly handled. Based on its review of available information regarding potential environmental impacts and proposed mitigation measures, IFC concludes that the proposed project is being designed to meet Government of Albania''s requirements and World Bank policies and environmental, health and safety guidelines. IFC will monitor Company''s ongoing compliance with the World Bank policies and guidelines during the life of the project. The is from the Public Information Center.Date SPI sent to InfoShop September 30, 1998“This Summary of Project Information is prepared and distributed to the public in advance of consideration of the proposed transaction by the Corporation’s Board of Directors. It is provided for the purpose of enhancing the transparency of IFC’s activities and should not be construed as presuming the outcome of IFC Board consideration.”For Additional Information contact: Corporate Relations Unit -telephone: (202) 473-7711facsimile: (202) 974-4384\\StreetTalk\Public@Network@IFC\PIC\als09216.docSeptember 30, 1998 7:35 PMEnvironmental documents for this project are available at http://www.ifc.org and from the World Bank InfoShop (http://www.worldbank.org/html/pic/aboutinfo.html). |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
