logo

SEF Grand Hotel II

Sector: Oil and Gas • Location: Mali

Source: International Finance Corporation (IFC)

Project
Completed

Environmental Review Summary (ERS)Project Name SEF - MALI: Le Grand Hotel II de BamakoRegion Sub Saharan AfricaSector TourismProject No. 008302 May 13, 1997 1. This project involves the construction of a new 80 room, four-star hotel for business travelers, in downtown Bamako, Mali. The hotel will have a conference center, restaurant, swimming pool and gymnasium.2. This is a

Project Information FAQ

Project Information

4 Q
The project “SEF Grand Hotel II” is an infrastructure initiative in the Oil and Gas sector, located in Mali. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Environmental Review Summary (ERS)Project Name SEF - MALI: Le Grand Hotel II de BamakoRegion Sub Saharan AfricaSector TourismProject No. 008302 May 13, 1997 1. This project involves the construction of a new 80 room, four-star hotel for business travelers, in downtown Bamako, Mali. The hotel will have a conference center, restaurant, swimming pool and gymnasium.2. This is a category B project according to IFC’s environmental review procedure because specific impacts may result which can be avoided or mitigated by adhering to generally recognized performance standards, guidelines or design criteria. The review of this project consisted of the appraisal of technical and environmental information submitted by the project sponsor and completed by IFC’s Environment Department staff. The key environmental, health and safety issues considered in this project include:· site settings and conditions;· water supply and sewage treatment or disposal;· solvents/waste/garbage management and disposal;· CFC-free cold storage and air conditioning;· fire protection and life safety measures; and· employee training and general safety.The sponsor has presented plans to address these issues and demonstrate that the proposed project will comply with applicable governmental and World Bank requirements. The information provided about how these potential impacts are addressed in the development of the project is summarized in the paragraphs that follow.3. The hotel is located in the central business district of the capital. The sitting of the new building will be on a 2 hectares plot of previously undeveloped land, close to the Niger River and the Convention Center. The project has been deemed consistent and in compliance with local zoning laws, land use practices and local sanitation and environmental requirements. Prior site use did not involve practices that may have caused land contamination. No family or business relocation will be necessary, nor deforestation will be needed.4. Because of the proximity of the groundwater table, the hotel sewage waste will be treated in an on-site plant built and operated by the sponsor. Design and construction will be done in close collaboration with the local public utility company (Energie du Mali, Division des Eaux). Final water discharge in the nearby river will be regularly monitored by the local regulatory authorities (Service d’Hygiène). This is in accordance with the Mali Health laws which establishes the capacities and methods of treatment. Any oily wastewaters generated will be treated in an oil/water separator prior to treatment. Grease removed by the separator will be removed from the tank, and then disposed off-site by a private contractor.5. Special premises will be constructed for the storage of all solid waste. Preliminary sorting will be done, to separate putrescible from others. No hazardous waste will be generated. The sponsor will hire a private contractor to collect the liquid and solid waste for proper disposal in a landfill according to local laws and regulations.6. The water supply and electricity will be provided by the city systems, both managed by the same private local utility company. The water quality will meet World Health Organization requirements and guidelines. Regarding power and water supply, local regulations will be also be enforced. Emergency electric power will be provided with on-site diesel generators. The tank containing the fuel will be stored underground within a barrier with cover and inspection manholes.7. The hotel''s air conditioning system and refrigeration facilities will not use CFC-based refrigerants in its compressors, thereby complying with World Bank guidelines.8. The hotel building will meet relevant French Standards for heat and smoke detection, alarms and fire fighting. Fire escape routes for the evacuation of occupants have been provided in accordance with French standards. Powder extinguishers will be also installed and, placed according to the fire department recommendations. Smoke detector system will be installed in all guest rooms, corridors, and all public areas. Emergency lighting and exit signs will be provided in all public areas to direct people to the nearest emergency staircase. Sprinklers will be installed in public areas such as the lobby, meeting rooms, and every guest room in the building. The fire protection and life safety systems will meet World Bank guidelines, and be regularly inspected by the local fire department (Sapeurs Pompiers du Mali).9. The sponsor has developed an emergency response and evacuation plan. The plan will address emergency response coordination with local authorities, personnel training and regular drills to address emergency situations of various magnitudes. The sponsor will comply with all World Bank guidelines for Health and Safety.10. Based on its review of available information regarding potential environmental impacts and proposed mitigation measures, IFC concludes that the proposed project is being designed to meet Government of Mali requirements, and World Bank policies, and environmental, health and safety guidelines.11. IFC will monitor SMPH’s ongoing compliance with World Bank policies and guidelines during the life of the project by evaluating monitoring reports submitted annually to IFC by the sponsor and by conducting periodic site reviews during project supervision.L:\WPEU\DIDIER\AEF\MALI\GRDHTL2.ERSMay 13, 1997 5:35 PM

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data