logo

SEF Hamdallaye

Sector: Waste Processing and Treatment • Location: Guinea

Source: International Finance Corporation (IFC)

Project
Completed

SUMMARY OF PROJECT INFORMATION (SPI)Project Name : Guinea-HamdallayeRegion : Sub-Saharan AfricaSector : Private EducationProject No : 008921Projected Board Date : July 1, 1998Company Name : HamdallayeTechnical Partner/ Major Shareholders:  Mr.  Aboulaye Wann, who owns 100% of Hamdallaye, is the main project sponsor. He started a primary school in 1994 which has been very successful and is

Project Information FAQ

Project Information

4 Q
The project “SEF Hamdallaye” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Guinea. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

SUMMARY OF PROJECT INFORMATION (SPI)Project Name : Guinea-HamdallayeRegion : Sub-Saharan AfricaSector : Private EducationProject No : 008921Projected Board Date : July 1, 1998Company Name : HamdallayeTechnical Partner/ Major Shareholders:  Mr.  Aboulaye Wann, who owns 100% of Hamdallaye, is the main project sponsor. He started a primary school in 1994 which has been very successful and is now planning an expansion into secondary education.Project Cost Including Proposed IFC Investment:  Total project cost is estimated at US$0.21 million equivalent.  IFC has been asked to provide a loan guarantee of US$0.1 million equivalent representing 50% of total project cost.Location of Project and Description of Site: The school complex is located in Ratoma, a commune of Conakry.  Total size of the land on which the secondary school complex will be built is 1,235 square meters.  Description of the Company and Purpose of the project: The project sponsor wants to create an integrated private school complex in Ratoma, the second largest commune of Conakry with an estimated population of 213,000 inhabitants, that would provide quality education to young guineans in secondary school attendance age.  Mr. Abdoulaye Wann, opened a primary school called “Hamdallaye primaire” in October 1994 with 4 classrooms.  Today, “Hamdallaye primaire” has 12 classrooms and a student body of 330 pupils.  Thanks to its innovative approach which lead to : a) the introduction of computer training and English in the primary school; b) built in services such as transportation and lunch at school; and c) in house training programs for teachers, Hamdallaye has set new standards of excellence and has attracted pupils as far away as outside the Ratoma commune. The purpose of this project is therefore to support the establishment of a full fledged secondary school that would operate on the same basis of excellence.IFC Role: IFC is instrumental in moving the deal forward.  The school has in the past benefited from a small loan from a UNDP financed program however this expansion is a larger size project.  Local banks, although they considered the sponsor to be a serious individual, were lukewarm in going ahead and financing a school due to the lower returns in this sector. IFC’s involvement in the deal has made it possible to get BICIGUI interested in the project and secure long-term financing crucial to this activity. This SEF investment in Guinea will serve as a catalyst for other enterprises and provide example value to a sector which is a high priority on governments agenda.  Environmental Category and Issues: This is an environmental review category B project. Environmental, health and safety issues include treatment and disposal of sewage; waste/garbage management and disposal; hazardous chemicals use, storage, and handling; and fire protection and life safety.  Sanitary effluents will be stored in an underground tank and periodically removed for ultimate delivery to an authorized municipal treatment and disposal facility.  Solid  wastes will be collected in bins located thoughout the school, which, in turn, will be emptied for disposal at the local authorized municipal dump.  No Ozone Depleting Substances (e.g., CFCs) will be used on the premises.  All hazardous chemicals will be stored in clearly labeled containers, properly segregated, and stored in a manner that will prevent accidents and release to the environment.  Adequate fire protection and life safety measures will be provided.The Environmental Review Summary will be available from the Public Information Center.Date SPI sent to PIC June 1, 1998This Summary of Project Information is prepared and distributed to the public in advance of consideration of the proposed transaction by the Corporation’s Board of Directors.  It is provided for the purpose of enhancing the transparency of IFC’s activities and should not be construed as presuming the outcome of IFC Board consideration.For additional information contact : Corporate Relations Unit -Telephone : (202) 473-7711Facsimile : (202) 974-4384 Environmental documents for this project are available at http://www.ifc.org and from the World Bank InfoShop (http://www.worldbank.org/html/pic/aboutinfo.html).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data