logo

SEF Nouvelles Brasseries Africaines (NBA SA)

Sector: Waste Processing and Treatment • Location: Senegal

Source: International Finance Corporation (IFC)

Project
Completed
			Revised Environmental Review Summary first submitted 3/26/97Project Name			SEF - SENEGAL:  Nouvelles Brasseries Africaines (NBA)Region				Sub-Saharan AfricaSector				Consumer goods manufacturingProject No.			008131						_________________________________________________________________________________1.		This project, which is being financed through the Small Enterprise Fund, involves the expan

Project Information FAQ

Project Information

4 Q
The project “SEF Nouvelles Brasseries Africaines (NBA SA)” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Senegal. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Revised Environmental Review Summary first submitted 3/26/97Project Name SEF - SENEGAL: Nouvelles Brasseries Africaines (NBA)Region Sub-Saharan AfricaSector Consumer goods manufacturingProject No. 008131 _________________________________________________________________________________1. This project, which is being financed through the Small Enterprise Fund, involves the expansion of the NBA in order to increase production capacity from 7,000 liters to 17,000 liters per hour. The additional investments include a 10,000 bottle per hour filling chain, construction of a water storage tank, purchase of refrigerated display cabinets for selected distributors, acquisition of power generators and delivery trucks, and improvements to the computerized information system. It will help the company reduce its unit fixed costs, and consolidate its position in the Senegalese soft drink market. 2. This is a category B project according to IFC''s environmental review procedure because specific impacts may result which can be avoided or mitigated by adhering to generally recognized performance standards, guidelines or design criteria. The following potential environmental, health and safety impacts of the project were analyzed:· water and power supply;· treatment and discharge of liquid wastes;· handling, storage and disposal and/or reuse of solid waste;· use of CFC for refrigeration;· plant hygiene and housekeeping;· workers safety and training;· employee exposure to dust, heat, and noise; and· fire prevention and emergency evacuation.3. The sponsor has submitted a plan addressing the key issues listed above. Keyelements of this plan and proposed measures to address environmental, health and safety issuesare summarized below.4. Water supply will be from the existing SDE water company system from the national grid. Power supply will come from the existing National Electricity Company (SENELEC).5. Effluent from bottling process containing caustic soda will be treated biologically in a lagoon. NBA anticipates that the effluent, prior to release, will have pH, Temperature, BOD and bacteriological content levels within the stipulated World Bank limits. Sanitary wastewater will be discharged into the municipal sewerage system. Two local laboratories will undertake, on a regular basis, sampling and analysis, under the supervision of the respective government agency (Direction Nationale de l’Environnement).6. Most of the solid waste is glass breakage which will be recycled by the bottle manufacturer, the remainder will be disposed in a municipal landfill.7. Cold storage will utilize an R-22 based cooling liquid, which is a transitional refrigerant acceptable under the Montreal Protocol. New facilities will be CFC-free, and existing equipment will be gradually phased out as per Senegal''s commitments under the Montreal Protocol.8. The company maintains fire fighting equipment at all operations, and employees will be trained and periodically drilled in emergency response and evacuation procedures. The plant will be equipped with fire extinguisers, emergency first aid kits and a proper ventilation system. The Fire Department of Dakar will inspect NBA on a regular basis.9. NBA management will seek to maintain the strictest standards of planthygiene, and will follow good housekeeping measures. All employees will be provided withprotective clothing and equipment, and training in safe work habits will be mandatory.Regular occupational health and safety training and awareness programs will be implemented. Employee exposure to heat will be controlled with adequate ventilation, and noise levels will bewithin safe limits.10. Based on it''s review of the environmental information submitted by NBA,IFC concludes that the proposed project is being designed to meet applicable Government ofSenegal requirements, and World Bank policies, and environmental, health and safety guidelines.IFC will monitor ongoing compliance with World Bank policies and guidelines during the lifeof the project by evaluating monitoring reports submitted annually to IFC by the sponsor and byconducting, periodic site reviews during project supervision.L:\WPEU\DIDIER\AEF\SENEGAL\SEF\NBA.ERSMarch 25, 1997 3:15 PM

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data