logo

Segari Energy Ventures (Lumut)

Sector: Power Generation (CCGT) • Location: Malaysia

Source: World Bank Group

Project
Active

Segari Energy Ventures (SEV), formerly Sikap Power Sdn. Bhd., was originally a joint venture consisting of Malakoff Bhd (75%), Tenaga Nasional Bhd (TNB) (20%), and the Employees Provident Fund (EPF) (5%). Through a BOO arrangment, SEV developed a 1303-MW (2x 651.5-MW) base-load power plant at Lumut Perak State. The project also involved construction of a 120-mile, 500kV transmission line between

Project Information FAQ

Project Information

4 Q
The project “Segari Energy Ventures (Lumut)” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Malaysia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Segari Energy Ventures (SEV), formerly Sikap Power Sdn. Bhd., was originally a joint venture consisting of Malakoff Bhd (75%), Tenaga Nasional Bhd (TNB) (20%), and the Employees Provident Fund (EPF) (5%). Through a BOO arrangment, SEV developed a 1303-MW (2x 651.5-MW) base-load power plant at Lumut Perak State. The project also involved construction of a 120-mile, 500kV transmission line between Ayer Tawar and Kunjong, Kedah, 2x275kV transmission lines connections (91.6km) to the Ayer Tawar sub-station, and a 183km gas pipeline Meru, Klang to Lumut. The first and second generating units were commissioned in May 1996 and May 1997, respectively. Teknik Janauasa Sdn. Bhd (TJSB) was the project operator. The EPC contractor and equipment supplier was ABB Power Generation Sdn. Bhd and the technical consultant was SWEC Zainal Sdn. Bhd. Funding for the project was raised entirely from local capital market and secured on a floating charge and assignment of collateral on all contracts. Equity accounted for $440 million, while $550 million was raised via fixed-rate debt securities and another $550 million was raised via floating non-recourse loans (15-year term) from Bank Bumiputra Malaysia Bhd and Malayan Banking Bhd. A 21-year PPA was signed in 1993 with Tenaga Nasional Bhd. (TNB). In June of 2004, Malakoff agreed to buy an additional 18.75% in SEV from TNB for US$98 million, increasing its stake to 93.75%. TNB concurrently sold its remaining 1.25% stake to EPF for US$6.58 million.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data