logo
ProjectClosed

SEGBA POWER III

Sector: Power Transmission • Location: Argentina

Source: World Bank Group

The main features are to build a 120 km long transmission ring around Buenos Aires, connect the transmission lines from El Chocon and Atucha, and further extend and strengthen the distribution network in Greater Buenos Aires. Investment in generating capacity will be relatively small. The project thus marks SEGBA's transformation from a utility supplying primarily self-generated electricity to a d

Status
Closed
Sector
Power Transmission, Power Generation (CCGT), Government
Location
Argentina
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about SEGBA POWER III

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “SEGBA POWER III” is an infrastructure initiative in the Power Transmission sector, located in Argentina. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The main features are to build a 120 km long transmission ring around Buenos Aires, connect the transmission lines from El Chocon and Atucha, and further extend and strengthen the distribution network in Greater Buenos Aires. Investment in generating capacity will be relatively small. The project thus marks SEGBA's transformation from a utility supplying primarily self-generated electricity to a distributor of large amounts of energy generated by others outside the metropolitan area. The proposed loan would cover (a) the cost of certain equipment and material purchased abroad and 60 percent of the cost of certain equipment and materials purchased in Argentine, (b) the estimated foreign exchange content of the cost of civil works and equipment erection, (c) the foreign cost of consulting services, (d) interest during construction and (e) contingencies.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Argentina

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Transmission, Power Generation (CCGT), Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project