logo

SEGBA POWER III

Sector: Power Transmission • Location: Argentina

Source: World Bank Group

Project
Closed

The main features are to build a 120 km long transmission ring around Buenos Aires, connect the transmission lines from El Chocon and Atucha, and further extend and strengthen the distribution network in Greater Buenos Aires. Investment in generating capacity will be relatively small. The project thus marks SEGBA's transformation from a utility supplying primarily self-generated electricity to a d

Project Information FAQ

Project Information

5 Q
The project “SEGBA POWER III” is an infrastructure initiative in the Power Transmission sector, located in Argentina. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The main features are to build a 120 km long transmission ring around Buenos Aires, connect the transmission lines from El Chocon and Atucha, and further extend and strengthen the distribution network in Greater Buenos Aires. Investment in generating capacity will be relatively small. The project thus marks SEGBA's transformation from a utility supplying primarily self-generated electricity to a distributor of large amounts of energy generated by others outside the metropolitan area. The proposed loan would cover (a) the cost of certain equipment and material purchased abroad and 60 percent of the cost of certain equipment and materials purchased in Argentine, (b) the estimated foreign exchange content of the cost of civil works and equipment erection, (c) the foreign cost of consulting services, (d) interest during construction and (e) contingencies.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data