Segou Solaire
Sector: Waste Processing and Treatment • Location: Mali
Source: International Finance Corporation (IFC)
The Project consists in the development, design, financing, construction, operation and maintenance of a 33 MW greenfield Solar Plant located in Segou, Mali. The installation will be equipped with approximately 130,000 photovoltaic modules, installed on a fixed mounted structure and optimized to have a total production of about 57 GWh on yearly basis (i.e 4% of the total electricity production in
- Status
- Closed
- Sector
- Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Solar, Water Supply and Storage, Government
- Location
- Mali
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about Segou Solaire
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | hold |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists in the development, design, financing, construction, operation and maintenance of a 33 MW greenfield Solar Plant located in Segou, Mali. The installation will be equipped with approximately 130,000 photovoltaic modules, installed on a fixed mounted structure and optimized to have a total production of about 57 GWh on yearly basis (i.e 4% of the total electricity production in Mali.). The Plant will be connected to the national grid through a transmission line included into the Project’s Scope. The Project will sell power to the national utility EDM under a 25 years Power Purchase Agreement (“PPA”) backed by a guarantee from the Government of Mali and an IDA Partial Risk Guarantee. |
Original sector | V-BF - Solar - Renewable Energy Generation |
Procurement method | |
Budget |
Location
Country | Mali |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Solar, Water Supply and Storage, Government |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
