logo
ProjectCompleted

SEI Solar Power Pvt. Ltd

The status, timeline and source of this project. A free account opens every field.

Source: International Finance Corporation (IFC)

The proposed project involves project financing of a 24 MWp solar photovoltaic power project on an 82.5 ha barren area in the Ugras village at approximately 35 km from the Phalodi Tehsil village in the district of Jodhpur, Rajasthan state, India. The project will be developed by a joint venture between Astronergy Solar Korea (ASK) and SunEdison Energy Holding (Singapore) Pte Ltd. The solar pan

Status
Closed
Sector
Solar, Power Generation (CCGT), Power Transmission, Road, Government
Location
India
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about SEI Solar Power Pvt. Ltd

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SEI Solar Power Pvt. Ltd” is an infrastructure initiative in the Solar sector, located in India. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project involves project financing of a 24 MWp solar photovoltaic power project on an 82.5 ha barren area in the Ugras village at approximately 35 km from the Phalodi Tehsil village in the district of Jodhpur, Rajasthan state, India. The project will be developed by a joint venture between Astronergy Solar Korea (ASK) and SunEdison Energy Holding (Singapore) Pte Ltd. The solar panels to be installed will convert sunlight to DC (Direct Current) electricity. The DC power will be sent to an Inverter to convert the DC power into AC (Alternate Current) power which will then be fed into the utility power grid. As part of the project, the Company will install an approximately 12 kilometers transmission line (33 kV) to transport the generated electricity to the main grid. The routing of the transmission line, which will be so selected as to remain within the right of way of existing roads, is being finalized. Since the project site is located in an area already accessible to the state highway, there will not be a need to open access roads. The nearest population settlement is approximately 2 km from the project site.

Original sector

V-BF - Solar - Renewable Energy Generation

Location

Country

India

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT), Power Transmission, Road, Government

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project