logo

SEI Solar Power Pvt. Ltd

Sector: Road • Location: India

Source: International Finance Corporation (IFC)

Project
Completed

The proposed project involves project financing of a 24 MWp solar photovoltaic power project on an 82.5 ha barren area in the Ugras village at approximately 35 km from the Phalodi Tehsil village in the district of Jodhpur, Rajasthan state, India. The project will be developed by a joint venture between Astronergy Solar Korea (ASK) and SunEdison Energy Holding (Singapore) Pte Ltd. The solar pan

Project Information FAQ

Project Information

4 Q
The project “SEI Solar Power Pvt. Ltd” is an infrastructure initiative in the Road sector, located in India. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project involves project financing of a 24 MWp solar photovoltaic power project on an 82.5 ha barren area in the Ugras village at approximately 35 km from the Phalodi Tehsil village in the district of Jodhpur, Rajasthan state, India. The project will be developed by a joint venture between Astronergy Solar Korea (ASK) and SunEdison Energy Holding (Singapore) Pte Ltd. The solar panels to be installed will convert sunlight to DC (Direct Current) electricity. The DC power will be sent to an Inverter to convert the DC power into AC (Alternate Current) power which will then be fed into the utility power grid. As part of the project, the Company will install an approximately 12 kilometers transmission line (33 kV) to transport the generated electricity to the main grid. The routing of the transmission line, which will be so selected as to remain within the right of way of existing roads, is being finalized. Since the project site is located in an area already accessible to the state highway, there will not be a need to open access roads. The nearest population settlement is approximately 2 km from the project site.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data