SEI Solar Power Pvt. Ltd
Sector: Road • Location: India
Source: International Finance Corporation (IFC)
The proposed project involves project financing of a 24 MWp solar photovoltaic power project on an 82.5 ha barren area in the Ugras village at approximately 35 km from the Phalodi Tehsil village in the district of Jodhpur, Rajasthan state, India. The project will be developed by a joint venture between Astronergy Solar Korea (ASK) and SunEdison Energy Holding (Singapore) Pte Ltd. The solar pan
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed project involves project financing of a 24 MWp solar photovoltaic power project on an 82.5 ha barren area in the Ugras village at approximately 35 km from the Phalodi Tehsil village in the district of Jodhpur, Rajasthan state, India. The project will be developed by a joint venture between Astronergy Solar Korea (ASK) and SunEdison Energy Holding (Singapore) Pte Ltd. The solar panels to be installed will convert sunlight to DC (Direct Current) electricity. The DC power will be sent to an Inverter to convert the DC power into AC (Alternate Current) power which will then be fed into the utility power grid. As part of the project, the Company will install an approximately 12 kilometers transmission line (33 kV) to transport the generated electricity to the main grid. The routing of the transmission line, which will be so selected as to remain within the right of way of existing roads, is being finalized. Since the project site is located in an area already accessible to the state highway, there will not be a need to open access roads. The nearest population settlement is approximately 2 km from the project site. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
