In February 2014, SEI Surya Lab Private Limited (SSLPL),a special purpose vehicle of Sunedison Inc., was awarded the license for setting up a 30 MW grid connected solar Photo voltaic power project in Rajasthan, under the Jawaharlal Nehru Solar Mission (JNNSM)Phase-II Batch-I of the scheme. Under the JNNSM Phase-II the total aggregated capacity of grid connected Solar PV Projects was expected to be

Status
Prospective
Sector
Commercial, Power Generation (CCGT), Solar, Warehouse, Government, Manufacturing (Industrial), Residential, Automotive
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about SEI Surya Lab Private Limited

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “SEI Surya Lab Private Limited” is an infrastructure initiative in the Commercial sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In February 2014, SEI Surya Lab Private Limited (SSLPL),a special purpose vehicle of Sunedison Inc., was awarded the license for setting up a 30 MW grid connected solar Photo voltaic power project in Rajasthan, under the Jawaharlal Nehru Solar Mission (JNNSM)Phase-II Batch-I of the scheme. Under the JNNSM Phase-II the total aggregated capacity of grid connected Solar PV Projects was expected to be 750 MW. The output from the project would be fed to the Northern,Eastern,Western and North Eastern (NEWNE) grid of India. The JNNSM mission had designated Solar Energy Corporation of India (SECI) as the nodal agency for procurement of solar power under Phase-II bidding. The winners were the project developers who sought the minimum possible funds to make their projects viable to sell power to SECI at the designated tariff. With an objective to promote local manufacturing, SECI invited bids in two separate categories, reserving half of the projects under domestic content requirement (DCR) restrictions. Separate bids were called for 375 MW capacity under DCR category and remaining 375 MW under open category. INR 18.75 billion was earlier approved for viability gap funding (VGF) of all the projects under JNNSM Phase-II Batch-I. 122 bids amounting to 2170MW were offered. Since the bids were more than the 750MW, winners were decided based on reverse bidding for viability gap funding demand. In the DCR category, bids varied from INR 13.5 million/MW to INR 24.56 million/MW. In the Open category, the bids varied from INR 1.7 million/MW to INR 13.5 million/MW. SEI Surya Lab Private Limited (SSLPL) had won the bid under the non-DCR category by quoting a viability gap funding of INR 8.73mn/MW, which amounted to a VGF grant of US$ 4.3mn (INR 261.86mn @61 INR/USD). SSLPL had entered into a 25-year Power Purchase Agreement with SECI. Transmission and/or wheeling charges would be paid by WSUP.The feed-in tariff was designated at INR 5.45/kWh (INR 4.75/kWh for projects claiming accelerated depreciation) for 25 years. Financial closure took place in October 2014. The total project cost estimated at the time of financial closure was about US$ 33.8mn (INR 2061.86mn @61 INR/USD). Apart from the grant from SECI of US$ 4.3mn, financing comprised of a term loan of US$ 29.5mn (INR 1800mn). Details of sponsor equity were not available. The term loan was provided by ORIX Corp and Rabobank Nederland. The construction for the project started in October 2014 and was expected to be commissioned by March 2015 (13 months from award).

Original sector

Energy

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Solar, Warehouse, Government, Manufacturing (Industrial), Residential, Automotive

Article published date

2024-09-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project