logo

Selective Grading Culvert Replacement

Sector: Cement • Location: Edmonton, Alberta, Canada

Source: Dodge

Project
Closed

Selective Grading, Culvert Replacement, Granular Base Course, Cold Milling, Asphalt Concrete Pavement, Street Light Installation and Other Work 43:16 E. of Hwy 658 to 0.5 km E. of RR 90 kilometre 4.690 to 45.132 (EBL) Selective Grading, Install Smooth Wall Steel Pipe Culvert, Granular Base Course, Cold Milling, Concrete Curb, Construct Raised Concrete Medians, Asphalt Concrete Pavement, Street Lig

Status
Closed
Sector
Cement, Steel, Government, Road, Waste Processing and Treatment, Commercial, Water Supply and Storage, Metal, Manufacturing (Industrial)
Location
Edmonton, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Selective Grading Culvert Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Selective Grading Culvert Replacement” is an infrastructure initiative in the Cement sector, located in Edmonton, Alberta, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Selective Grading, Culvert Replacement, Granular Base Course, Cold Milling, Asphalt Concrete Pavement, Street Light Installation and Other Work 43:16 E. of Hwy 658 to 0.5 km E. of RR 90 kilometre 4.690 to 45.132 (EBL) Selective Grading, Install Smooth Wall Steel Pipe Culvert, Granular Base Course, Cold Milling, Concrete Curb, Construct Raised Concrete Medians, Asphalt Concrete Pavement, Street Light Installation, Upgrade Traffic Signals and Other Work 43:16 West Mountain Road / Govenlock Road...

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Edmonton

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Cement, Steel, Government, Road, Waste Processing and Treatment, Commercial, Water Supply and Storage, Metal, Manufacturing (Industrial)

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project