Selene Gas Project
Sector: Water Supply and Storage • Location: United Kingdom
Source: TipRanks
Deltic Energy has announced a significant update on its Selene Gas Project, revealing a 33% increase in estimated Gross 2C Contingent Resources to 174 BCF. The enhanced reservoir modelling and core sample analysis show improved production potential and increased project valuation, with a revised post-tax NPV10 of up to USD$114M.
- Status
- Prospective
- Sector
- Water Supply and Storage
- Location
- United Kingdom
- Updated
- 22 Jul 2026
- Source
- TipRanks
ConstructChat
Ask ConstructChat about Selene Gas Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Deltic Energy has announced a significant update on its Selene Gas Project, revealing a 33% increase in estimated Gross 2C Contingent Resources to 174 BCF. The enhanced reservoir modelling and core sample analysis show improved production potential and increased project valuation, with a revised post-tax NPV10 of up to USD$114M. |
Original sector | Energy |
Budget |
Location
Country | United Kingdom (UK) |
Source
Source | TipRanks |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage |
Article published date | 2025-04-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
