Semangka HPP

Sector: Hydro • Location: Indonesia

Source: World Bank Group

Project
Active

The 56.6MW Semangka Hydropower Plant Project reached financial closure in May 2015. Sponsors are POSCO, Korea Midland Power, BS Energy and Nusantara Hydro signed a US$142.81 million debt financing getting to a debt/equity ratio of 75:25. This greenfield BOO project worth of US$191 million would entail the development of 2 X 28.3MW hydroelectric conduit-type power generating facility located in the

Status
Prospective
Sector
Hydro, Power Generation (CCGT), Government, Manufacturing (Industrial), Automotive, Commercial
Location
Indonesia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Semangka HPP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Semangka HPP” is an infrastructure initiative in the Hydro sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The 56.6MW Semangka Hydropower Plant Project reached financial closure in May 2015. Sponsors are POSCO, Korea Midland Power, BS Energy and Nusantara Hydro signed a US$142.81 million debt financing getting to a debt/equity ratio of 75:25. This greenfield BOO project worth of US$191 million would entail the development of 2 X 28.3MW hydroelectric conduit-type power generating facility located in the Tanggamus region in the southern part of the Sumatra Island. PT Tanggamus Electric Power was the special purpose vehicle set up by Korea Midland Power Co., Ltd.(60%), Posco Engineering Co.(20%), Ltd., PT BS Energy(10%)and PT Nusantara Hydro Alam(10%). The Export-Import Bank of Korea(US$52.5 million), BNP Paribas (US$38 million), ING Bank N.V.(US$52.5 million) are the lenders on US$142.81 million. The debt financing involved two tranches of US$66.4 million each maturing in 2029 and 2031 respectively. It also included a US$10 million tranche maturing in 2030. Business Viability Guarantee Letter (BVGL) was provided by Indonesia Government on 17 Oct 2014. In May 2015, the construction started with expected construction period of two years and seven months from now and to be completed in Sept. 2017. The EPC contract was awarded to a group of five Korean companies, including POSCO Engineering and Haechang Construction Co. http://www.businesskorea.co.kr/news/industry/10416-power-semangka-komipo-build-2nd-hydro-power-plant-indonesia http://www.koreaexim.go.kr/en/bbs/ifnoti/view_ok.jsp?no=14849&bbs_code_id=1316753474007&bbs_code_tp=BBS_2 http://cdm.unfccc.int/filestorage/5/Y/T/5YTGC2H6XK9N3FVRMLWPISD4ZA07B1/PDD%20Version%201.6.pdf?t=MTN8bmw5NXVrfDABt2oC_e_qHb64iCvZ_gI1 Sponsor Korea Midland Power 60 Sponsor POSCO 20 Sponsor PT BS Energy 10 Sponsor PT Nusantara Hydro Alam 10

Original sector

Energy

Budget

Location

Country

Indonesia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Power Generation (CCGT), Government, Manufacturing (Industrial), Automotive, Commercial

Article published date

2024-09-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project