SEMRY RICE II
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The project would be carried out over a six-year period (1977/78- 1982/83) and would consist of: (a) constructing two dikes, totalling 48 km, with main intake structure, feeder canal, regulators, and drainage outfall; (b) constructing an irrigation and drainage system, including on-farms works and feeder roads, serving an area of 7,000 ha; (c) constructing access roads linking, in particular, the
- Status
- Closed
- Sector
- Airport, Road, Water Supply and Storage, Automotive, Waste Processing and Treatment, Consumer Products, Manufacturing (Industrial), Raw Materials, Government
- Location
- Cameroon
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about SEMRY RICE II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project would be carried out over a six-year period (1977/78- 1982/83) and would consist of: (a) constructing two dikes, totalling 48 km, with main intake structure, feeder canal, regulators, and drainage outfall; (b) constructing an irrigation and drainage system, including on-farms works and feeder roads, serving an area of 7,000 ha; (c) constructing access roads linking, in particular, the main localities in the project area, viz. Tekele, Pouss, Maga and Guirvidig, totalling 50 km; (d) constructing a headquarters and services complex, including staff housing, garages, warehouses, a rice mill, storage facilities, and an airstrip; (e) providing heavy earth moving and agricultural equipment, and vehicles; (f) Staffing and equipping the project authority, training local staff, and conducting applied research and studies; (g) providing 7,000 participating farm families, half of whom would be resettled, with support services including credit; and (h) providing a health program for the project area. |
Original sector | Agriculture, Fishing and Forestry |
Location
Country | Cameroon |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Airport, Road, Water Supply and Storage, Automotive, Waste Processing and Treatment, Consumer Products, Manufacturing (Industrial), Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Airport projects in Cameroon
- Agrandissement et rénovation d'un projet hôtelier
- Projet d'expansion pour les produits de cacao
- Aéroports du Cameroun
- Yaoundé Ville Airport Expansion
- Cameroon - Douala Airport Terminal Building
- Cameroon - Construction of the new Douala airport terminal, phase 3
- African Center of Medical Excellence
- Douala International Airport Terminal Renovation and Expansion
