Seneca Culvert Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
for the furnishing and/or installing of the following: Clear and grub the site, demo existing masonry head wall and retaining walls install 40 feet of 71 x 106 aluminized corrugated pipe. Regrade and install rip rap in the stream bad and slopes, pre cast head wall and drainage control structure. Remove and replace 6 foot vinal coated fence, plantings and install curbing and parking lot asphalt. No
- Status
- Prospective
- Sector
- Cement, Car parking, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Automotive, Commercial
- Location
- Dobbs Ferry, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Seneca Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | for the furnishing and/or installing of the following: Clear and grub the site, demo existing masonry head wall and retaining walls install 40 feet of 71 x 106 aluminized corrugated pipe. Regrade and install rip rap in the stream bad and slopes, pre cast head wall and drainage control structure. Remove and replace 6 foot vinal coated fence, plantings and install curbing and parking lot asphalt. No bids will be received or considered after the time stated above. Specifications and Bid Proposal... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Dobbs Ferry |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Car parking, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Automotive, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
