logo

Seneca Valley Intermediate HS & Arts Center Add & Renov

Sector: Cement • Location: Harmony, Pennsylvania, United States of America

Source: Dodge

Project
Closed

Project Description: Project consists of renovation of a portion of the existing Intermediate High School with additions including an academic wing and a performing arts center. 143,411 GSF selective renovation plus 204,534 GSF addition. Existing building two story steel framed structure with limited areas of concrete masonry bearing walls. New construction - three story steel framed structure wit

Status
Closed
Sector
Cement, Steel, Hospital, Education, Government, Commercial, Manufacturing (Industrial), Metal
Location
Harmony, Pennsylvania, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Seneca Valley Intermediate HS & Arts Center Add & Renov

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Seneca Valley Intermediate HS & Arts Center Add & Renov” is an infrastructure initiative in the Cement sector, located in Harmony, Pennsylvania, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Project Description: Project consists of renovation of a portion of the existing Intermediate High School with additions including an academic wing and a performing arts center. 143,411 GSF selective renovation plus 204,534 GSF addition. Existing building two story steel framed structure with limited areas of concrete masonry bearing walls. New construction - three story steel framed structure with limited areas of concrete masonry bearing walls.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Pennsylvania

City

Harmony

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Cement, Steel, Hospital, Education, Government, Commercial, Manufacturing (Industrial), Metal

Article published date

2025-09-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project