Senegal - 120 MW Malicounda Dual Fuel Power Project
One of 2,798 projects Taiyo tracks in Senegal.
Source: African Development Bank (AfDB)
The present intervention concerns the 120 MW Malicounda Dual Fuel Power Project. It aims to contribute to adding 120MW guaranteed generation capacity to accompany the GoS in its transformational industry goal and to align with the fast growing economy. The project entails the design, financing, construction and operation of a dual-fuel combined cycle power plant in Malicounda, Mbour, about 67 km f
- Sector
- Oil and Gas, Power Transmission, Power Generation (CCGT), Geothermal, Natural Gas, Government
- Location
- Senegal
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Senegal - 120 MW Malicounda Dual Fuel Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The present intervention concerns the 120 MW Malicounda Dual Fuel Power Project. It aims to contribute to adding 120MW guaranteed generation capacity to accompany the GoS in its transformational industry goal and to align with the fast growing economy. The project entails the design, financing, construction and operation of a dual-fuel combined cycle power plant in Malicounda, Mbour, about 67 km from Dakar, Senegal. It consists of a greenfield power plant with a PPA guaranteed to be developed under a 20-year Build-Own-Operate-Transfer (BOOT) scheme with Senelec, the state-owned utility. The plant will utilize heavy-fuel oil (HFO) as primary source of energy, and will be converted to natural gas as soon as it is available in the country. The plant will be connected to the grid through the existing 225kV substation adjacent to the site. The project will also contribute to the improvement of electricity access to the surrounding communities and villages through the medium voltage transmission line to be connected to the substation. |
Original sector | Energy |
Budget |
Location
Country | Senegal |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Power Transmission, Power Generation (CCGT), Geothermal, Natural Gas, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
