logo
Project

Senegal - 120 MW Malicounda Dual Fuel Power Project

One of 2,798 projects Taiyo tracks in Senegal.

Source: African Development Bank (AfDB)

The present intervention concerns the 120 MW Malicounda Dual Fuel Power Project. It aims to contribute to adding 120MW guaranteed generation capacity to accompany the GoS in its transformational industry goal and to align with the fast growing economy. The project entails the design, financing, construction and operation of a dual-fuel combined cycle power plant in Malicounda, Mbour, about 67 km f

Sector
Oil and Gas, Power Transmission, Power Generation (CCGT), Geothermal, Natural Gas, Government
Location
Senegal
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Senegal - 120 MW Malicounda Dual Fuel Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Senegal - 120 MW Malicounda Dual Fuel Power Project” is an infrastructure initiative in the Oil and Gas sector, located in Senegal. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The present intervention concerns the 120 MW Malicounda Dual Fuel Power Project. It aims to contribute to adding 120MW guaranteed generation capacity to accompany the GoS in its transformational industry goal and to align with the fast growing economy. The project entails the design, financing, construction and operation of a dual-fuel combined cycle power plant in Malicounda, Mbour, about 67 km from Dakar, Senegal. It consists of a greenfield power plant with a PPA guaranteed to be developed under a 20-year Build-Own-Operate-Transfer (BOOT) scheme with Senelec, the state-owned utility. The plant will utilize heavy-fuel oil (HFO) as primary source of energy, and will be converted to natural gas as soon as it is available in the country. The plant will be connected to the grid through the existing 225kV substation adjacent to the site. The project will also contribute to the improvement of electricity access to the surrounding communities and villages through the medium voltage transmission line to be connected to the substation.

Original sector

Energy

Budget

Location

Country

Senegal

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Oil and Gas, Power Transmission, Power Generation (CCGT), Geothermal, Natural Gas, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project