logo

Senegal - 120 MW Malicounda Dual Fuel Power Project

Sector: Oil and Gas • Location: Senegal

Source: African Development Bank (AfDB)

Project

The present intervention concerns the 120 MW Malicounda Dual Fuel Power Project. It aims to contribute to adding 120MW guaranteed generation capacity to accompany the GoS in its transformational industry goal and to align with the fast growing economy. The project entails the design, financing, construction and operation of a dual-fuel combined cycle power plant in Malicounda, Mbour, about 67 km f

Project Information FAQ

Project Information

4 Q
The project “Senegal - 120 MW Malicounda Dual Fuel Power Project” is an infrastructure initiative in the Oil and Gas sector, located in Senegal. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The present intervention concerns the 120 MW Malicounda Dual Fuel Power Project. It aims to contribute to adding 120MW guaranteed generation capacity to accompany the GoS in its transformational industry goal and to align with the fast growing economy. The project entails the design, financing, construction and operation of a dual-fuel combined cycle power plant in Malicounda, Mbour, about 67 km from Dakar, Senegal. It consists of a greenfield power plant with a PPA guaranteed to be developed under a 20-year Build-Own-Operate-Transfer (BOOT) scheme with Senelec, the state-owned utility. The plant will utilize heavy-fuel oil (HFO) as primary source of energy, and will be converted to natural gas as soon as it is available in the country. The plant will be connected to the grid through the existing 225kV substation adjacent to the site. The project will also contribute to the improvement of electricity access to the surrounding communities and villages through the medium voltage transmission line to be connected to the substation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data