logo

Senegal - Dakar stormwater management project

Sector: Water Supply and Storage • Location: Senegal

Source: African Development Bank (AfDB)

Project

This operation concerns studies for the preparation of an investment operation within the framework of the second phase of the Rainwater Management and Climate Change Adaptation Project (PROGEP II) in Dakar. The operation is a contribution by the AfDB to support the Government of Senegal in financing programmes to combat flooding, adapt to climate change and improve sanitation in general. The proj

Project Information FAQ

Project Information

4 Q
The project “Senegal - Dakar stormwater management project” is an infrastructure initiative in the Water Supply and Storage sector, located in Senegal. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This operation concerns studies for the preparation of an investment operation within the framework of the second phase of the Rainwater Management and Climate Change Adaptation Project (PROGEP II) in Dakar. The operation is a contribution by the AfDB to support the Government of Senegal in financing programmes to combat flooding, adapt to climate change and improve sanitation in general. The project is consistent with the Bank Group's urban development and water resources management strategy. The PPF advance is the most appropriate financing instrument for the application, as it ensures good quality at the project's outset and ensures that the risks and impacts are well understood and that the mitigation measures to be implemented are identified and their cost assessed. The main deliverables for each zone are: (i) an APS report, including any additional modelling, and an APD report with plans and appendices; (ii) tender documents (DAO) for the works; (iii) specific ESIA, RAP and E&S audit tools if necessary for the investments selected; and for both zones (iv) an audit report. It is structured into two components. The first component is entitled Detailed technical, environmental and social studies. It includes: (i) detailed technical studies and (ii) environmental and social studies of the areas identified for the implementation of the Investment Project. The second component relates to institutional support and project management. It includes support for the operation of the executing agency through: (i) helping to pay for the Project Management Unit's staff and management costs; (ii) paying for document validation workshops and the organisation of the round table; and (iii) auditing the accounts.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data