Senegal - Dakar stormwater management project
One of 2,798 projects Taiyo tracks in Senegal.
Source: African Development Bank (AfDB)
This operation concerns studies for the preparation of an investment operation within the framework of the second phase of the Rainwater Management and Climate Change Adaptation Project (PROGEP II) in Dakar. The operation is a contribution by the AfDB to support the Government of Senegal in financing programmes to combat flooding, adapt to climate change and improve sanitation in general. The proj
- Sector
- Water Supply and Storage, Telecommunications, Government
- Location
- Senegal
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Senegal - Dakar stormwater management project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This operation concerns studies for the preparation of an investment operation within the framework of the second phase of the Rainwater Management and Climate Change Adaptation Project (PROGEP II) in Dakar. The operation is a contribution by the AfDB to support the Government of Senegal in financing programmes to combat flooding, adapt to climate change and improve sanitation in general. The project is consistent with the Bank Group's urban development and water resources management strategy. The PPF advance is the most appropriate financing instrument for the application, as it ensures good quality at the project's outset and ensures that the risks and impacts are well understood and that the mitigation measures to be implemented are identified and their cost assessed. The main deliverables for each zone are: (i) an APS report, including any additional modelling, and an APD report with plans and appendices; (ii) tender documents (DAO) for the works; (iii) specific ESIA, RAP and E&S audit tools if necessary for the investments selected; and for both zones (iv) an audit report. It is structured into two components. The first component is entitled Detailed technical, environmental and social studies. It includes: (i) detailed technical studies and (ii) environmental and social studies of the areas identified for the implementation of the Investment Project. The second component relates to institutional support and project management. It includes support for the operation of the executing agency through: (i) helping to pay for the Project Management Unit's staff and management costs; (ii) paying for document validation workshops and the organisation of the round table; and (iii) auditing the accounts. |
Original sector | Water Supply & Sanitation |
Budget |
Location
Country | Senegal |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Telecommunications, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Senegal
- Notto Diosmone Palmarin and Gorom Lampsar Water Supply System
- Dakar Port Terminal
- AMA Senegal
- Senegal - Project to restore the ecological and economic functions of lake Guiers (PREFELAG)
- Senegal - Water Valorisation for Value Chains Development Project (PROVALE-CV)
- Augmentation des capacités de production (projet d'expansion)
- Senegalaise des Eaux
- Senegal Cross Currency Swap
