Senegal - Diam Niadio-Mbour-Kaolack Road Project
Sector: Commercial • Location: Senegal
Source: African Development Bank (AfDB)
The Diam Niadio-Mbour-Kaolack road project is one of the major components of the Second Transport Sectoral Programme (TSP N 02) in Senegal, covering the period 1999-2004. The TSP 2 aims to improve the existing institutional framework and adapt road, railway, port and airport infrastructure to the needs of the various sectors of activities, in view of the fact that emphasis is on opening up the rur
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Diam Niadio-Mbour-Kaolack road project is one of the major components of the Second Transport Sectoral Programme (TSP N 02) in Senegal, covering the period 1999-2004. The TSP 2 aims to improve the existing institutional framework and adapt road, railway, port and airport infrastructure to the needs of the various sectors of activities, in view of the fact that emphasis is on opening up the rural areas which are not easy of access. The project road, which is a section of the main highway linking Dakar and the neighbouring countries and through which most of the commercial activities are carried out by land, is an important link in the national and sub-regional road transport system. Improvement in its level of service vs therefore a determming factor for revitalising the country’s economy. The result expected is a 148 km road, entire y rehabilitated and consisting of the following sections: a) Diam Niadio-Mbour (42 km); b) Mbour-Fatick (64 km) and Fatick-Kaolack (42 km). The three sections of the road will be identical and will comprise 7.20 metres of iLsphalt concrete carriageway and two shoulders each measuring I _50 metres ; all the necessary hydraulic works will also be carried out, including development of localised parking places in towns crossed by the road. The Project cost estimate, exclusive of taxes and customs duties, is UA 26.80 million. The implementation period will be from April 2002 to 2004, that is about 26 months. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
