logo
Project

Senegal - Road Maintenance Project (PER)

One of 2,798 projects Taiyo tracks in Senegal.

Source: African Development Bank (AfDB)

The Road Maintenance Project is one of the major components ofthe second transport sector programme – PST2- whose implementation covers the 2000 – 2006 period. Under the project, road sections selectedfor rehabilitation and periodic maintenance formed part of the priorities of the road sub-sector. The works concern a total length of 482 kilometres distributed between seven out of the country’s ele

Sector
Bridge, Education, Hospital, Road, Government
Location
Senegal
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Senegal - Road Maintenance Project (PER)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Senegal - Road Maintenance Project (PER)” is an infrastructure initiative in the Bridge sector, located in Senegal. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Road Maintenance Project is one of the major components ofthe second transport sector programme – PST2- whose implementation covers the 2000 – 2006 period. Under the project, road sections selectedfor rehabilitation and periodic maintenance formed part of the priorities of the road sub-sector. The works concern a total length of 482 kilometres distributed between seven out of the country’s eleven regions, namely Diourbel, Fatick, Kaolack, Kolda, Saint-Louis, Thiès and Ziguinchor. In addition, a 640m long bridge should be rehabilitated in the Ziguinchor region. The project should generate a variety of social benefits such as the opening up of over 80 urban and rural localities,increased access to primary education and medical services at less than 30 minutes away by about 80% of the population in the PAI by 2008 as against 75% and 77% respectively in 2003. The expected project outcomes are: (i) 116 km of rehabilitated paved roads, (ii) 338 km of rehabilitated earth roads, (iii) 28 kmof paved roads reinforced, (iv) 640m-long bridge rehabilitated, (v) 20 workers of the MIETTTMI trained, (vi) 300,000 persons sensitized about road safety, environmental protection and HIV/AIDS, and (vii) 2 schools at Kavil and Keur Socé along the KavilKeur Madiabel road rebuilt and protected.

Original sector

Transport & Storage

Budget

Location

Country

Senegal

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Bridge, Education, Hospital, Road, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project