Senegal - Saint-Louis Emergency Recovery and Resilience Project
Sector: Road • Location: Senegal
Source: World Bank Group
The development objective of the Saint-Louis Emergency Recovery and Resilience Project for Senegal is to reduce the vulnerability of populations to coastal hazards along the Langue de Barbarie and strengthen urban and coastal resilience planning of the city of Saint-Louis. It has five component. First component, Meeting immediate needs of the disaster affected population is to support the GOS to
- Status
- Prospective
- Sector
- Road, Water Supply and Storage, Power Generation (CCGT), Forest Products and Packaging, Aerospace & Defense, Commercial, Government
- Location
- Senegal
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Senegal - Saint-Louis Emergency Recovery and Resilience Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The development objective of the Saint-Louis Emergency Recovery and Resilience Project for Senegal is to reduce the vulnerability of populations to coastal hazards along the Langue de Barbarie and strengthen urban and coastal resilience planning of the city of Saint-Louis. It has five component. First component, Meeting immediate needs of the disaster affected population is to support the GOS to provide temporary accommodation and related services for households currently displaced by the disaster, and urgently improve their living condition n line with global standard practice. The component will finance: (i) the provision of rental subsidies; and (ii) good, services and civil works required to erect temporary dwellings and provide related essential services on the permanent relocation site (electricity, water supply, sanitation), to be situated in an area not prone to flooding; Second component, Planned relocation of populations living in the highest risk zones in the Langue de Barbari will finance the planned relocation of households affected by coastal erosion, and living in the extremely high-risk zone along the Langue de Barbarie. The activities under this component will be financed through four sub-components: (i) design and implementation of the citizen engagement and social support strategy; (ii) development of the relocation site; (iii) construction of permanent dwellings for the population affected by coastal erosion; and (iv) livelihood restoration for the displaced populations; Third component, Strengthening urban and coastal resilience planning will consist of (i) the recruitment of a consultant to conceptualize design a site development plan for the liberated area, including participatory input form the local community; and (ii) site development works to reclaim the area. Land rights will be transferred to the Government so that they can exercise effective control of new occupation, and reclaim and maintain the at-risk area; Fourth component, contingent emergency response will draw from the uncommitted credit resources under the project from other project components to cover emergency response.; Fifth component, project management,monitoring and evaluation will support project management and coordination and monitoring and evaluation for the project. It will finance the administrative management of the Project by the Project Coordinating Unit (ADM) and implementing partners, including: (i) recruitment of specialists in financial management, procurement, and monitoring and evaluation; (ii) carrying out the fiduciary aspects of the Project including audits; (iii) technical and safeguard audits, including beneficiary surveys; (iv) design and operationalization of the Grievance Redress Mechanism (GRM); (v) the provision of training and workshops; (vi) communication; (vii) the financing of the necessary goods, equipment, and operating costs; and (viii) costs associated with convening and reporting to the Project Technical Committee (PTC) and Project Steering Committee (PSC). It will also support the design and implementation of a detailed monitoring and evaluation plan. |
Original sector | FY17 - Public Administration |
Budget |
Location
Country | Senegal |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Power Generation (CCGT), Forest Products and Packaging, Aerospace & Defense, Commercial, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Senegal
- Senegal - Transport Sector Support Project: Rehabilitation of the Dinguiraye-Nioro-Keur Ayib Road
- Senegal - The Dakar-Diamniadio Highway Construction Project
- DP World Dakar SA
- Senegal Eurobond - Cross Currency Swap Arrangement
- Tobene Power, SA
- Dakar-Diamniadio Toll Road Extension
- Senegal - Cities Modernisation Programme – Phase 1 (Promovilles-1)
- Dakar Diamniadio Toll Road