logo
Project

Senegal - Sendou Power Project

The status, timeline and source of this project. A free account opens every field.

Source: African Development Bank (AfDB)

This project focuses on the development, construction, operation and maintenance of a 125 MW power plant using coal as a fuel base through a "Build, Own, Operate (BOO)” arrangement. The plant will be located near Bargny Minam village, about 32 km from the city of Dakar. This project is strategically important for Senegal, whose main objective pursued by the Government as part of its energy sector

Sector
Oil and Gas, Power Generation (CCGT), Education, Raw Materials, Manufacturing (Industrial), Government
Location
Senegal
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Senegal - Sendou Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Senegal - Sendou Power Project” is an infrastructure initiative in the Oil and Gas sector, located in Senegal. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project focuses on the development, construction, operation and maintenance of a 125 MW power plant using coal as a fuel base through a "Build, Own, Operate (BOO)” arrangement. The plant will be located near Bargny Minam village, about 32 km from the city of Dakar. This project is strategically important for Senegal, whose main objective pursued by the Government as part of its energy sector development policy is to improve electricity supply in terms of reliability and cost. The use of coal as a source of energy rather than petroleum (fuel-oil) will enable the country to reduce its energy costs, which will improve competitiveness and sustainability and enhance long-term economic growth, by increasing Senegal’s infrastructure capacity, and by promoting foreign direct investment. It will be implemented over 24 months, including foreign direct investment. Once completed, the project, will on the one hand, diversify electrical energy sources in Senegal, and on the other hand, ensure adequate supply to meet the growing demand at an estimated 7.89% annually for the 2005-2025 period. It will help increase SENELEC’s generation capacity by supplying an additional approximately 925 GWh per annum to the interconnected grid to bring the plant to 91.8% capacity. Thus, the proposed plant will cover about 12% of the annual electric energy consumption projected for 2052, estimated at 8,443 GWh. The first of its kind in Senegal, the coal power plant will also contribute to north-south technology and skill transfer.

Original sector

Energy

Budget

Location

Country

Senegal

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Oil and Gas, Power Generation (CCGT), Education, Raw Materials, Manufacturing (Industrial), Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project