logo

Senegal: Renewable Energy Integration Program

Sector: Energy Storage • Location: Senegal

Source: KFW Bank aus Verantwortung

Project
Active

The increasing expansion of renewable energies is presenting the Senegalese electricity sector with new challenges. The fluctuating generation from renewable energy sources - sun and wind are not continuously available - is a permanent challenge for grid integration and control. The project therefore aims to improve electricity quality and reduce power outages through the integration of renewable

Project Information FAQ

Project Information

5 Q
The project “Senegal: Renewable Energy Integration Program” is an infrastructure initiative in the Energy Storage sector, located in Senegal. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The increasing expansion of renewable energies is presenting the Senegalese electricity sector with new challenges. The fluctuating generation from renewable energy sources - sun and wind are not continuously available - is a permanent challenge for grid integration and control. The project therefore aims to improve electricity quality and reduce power outages through the integration of renewable energies and to reduce CO2 emissions. In order to compensate for fluctuations, the installation of an electrical battery storage system (BESS) is planned, among other things. In addition, this BESS takes on the function of the still missing, quickly mobilizable operating reserve at Senelec, the state-owned energy supply company. Overloads on the electricity transmission network can be avoided through the adaptable absorption and release of energy, and failures and damage to the network and machines can be reduced. The substitution of fossil electricity generation also contributes to decarbonization and saving CO2 emissions. The development of the renewable energy resources available in Senegal is of strategic importance in order to reduce energy dependence on expensive fossil fuel imports and ultimately also to reduce the cost of electricity generation. The BESS is to be built next to the Diass solar power plant and connected to the substation there. The target groups are all population groups and economic sectors that benefit from a reliable, sustainable and energy-efficient energy supply and use. The total cost of the project is estimated at EUR 28.6 million (FC funds EUR 18 million, AFD loan EUR 8 million and Senelec's own contribution of around EUR 2.6 million). The expected implementation period of the project is 2021-2024.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data