Senegal Thermal Facility
Sector: Natural Gas • Location: Senegal
Source: World Bank Group
The brownfield ROT project entails the rehabilitation of an existing 53MW thermal facility located outside of the capital city Dakar, in Senegal. The new plant would burn heavy fuel oil and natural gas and use Wartsila 18V46 high efficiency engines. The estimated cost of the project is US$172 million (85 million Euro) and it was financed from equity investment came from a sole sponsor, ContourGlob
- Status
- Prospective
- Sector
- Natural Gas, Geothermal, Oil and Gas, Power Generation (CCGT), Government
- Location
- Senegal
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Senegal Thermal Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The brownfield ROT project entails the rehabilitation of an existing 53MW thermal facility located outside of the capital city Dakar, in Senegal. The new plant would burn heavy fuel oil and natural gas and use Wartsila 18V46 high efficiency engines. The estimated cost of the project is US$172 million (85 million Euro) and it was financed from equity investment came from a sole sponsor, ContourGlobal. |
Original sector | Energy |
Budget |
Location
Country | Senegal |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Natural Gas, Geothermal, Oil and Gas, Power Generation (CCGT), Government |
Article published date | 2024-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
