logo

SENOK Mampuri 2 & 3 Wind Farms

Sector: Car parking • Location: Sri Lanka

Source: World Bank Group

Project
Active

Senok Wind Power Pvt. Ltd., subsidiary of Senok Group, was planning the development of the 10MW Mapuri 2 and 10MW Mapuri 3 Wind Farms.

Senok group uses three SPVs for their wind farms: Mampuri 1: Senok Wind Power Pvt. Ltd (WPP) Mampuri 2: Senok Wind Energy Pvt. Ltd. (WEP) Mampuri 3: Senok Wind Resource Pvt. Ltd. (WRP)

Both Mamprui 2 & 3 involve the construction of 5 turbines of 2.1 MW. Mampuri 2

Status
Prospective
Sector
Car parking, Wind, Raw Materials, Power Transmission, Government, Power Generation (CCGT), Automotive, Commercial
Location
Sri Lanka
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about SENOK Mampuri 2 & 3 Wind Farms

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “SENOK Mampuri 2 & 3 Wind Farms” is an infrastructure initiative in the Car parking sector, located in Sri Lanka. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Senok Wind Power Pvt. Ltd., subsidiary of Senok Group, was planning the development of the 10MW Mapuri 2 and 10MW Mapuri 3 Wind Farms. Senok group uses three SPVs for their wind farms: Mampuri 1: Senok Wind Power Pvt. Ltd (WPP) Mampuri 2: Senok Wind Energy Pvt. Ltd. (WEP) Mampuri 3: Senok Wind Resource Pvt. Ltd. (WRP) Both Mamprui 2 & 3 involve the construction of 5 turbines of 2.1 MW. Mampuri 2 was to be build on the coastal stretch in Nawakkadu village. Mampuri 3 was to be build on the coastal stretch in Narakkali, Mamprui and Nawakkadu villages. Project was recorded here as under development as no details about financial closure were available. The FC date reported is the date of IFC equity stake. The project also involves the construction of a transformer switchyard and park power line. Other facilities are shared with the operational Mapuri 1. The output was to be transmissioned to the Norochcholai 220kV substation. Electricity price was Rs.20.80 ($0.2292). The project held a Standard PPA with the Ceylon Electricity Board for 20 years. Commissioning of Mapuri 2 was expected for late 2011. The equipment supply contract was awarded to Suzlon, from India, supplying 10 turbines of the type S88 2.1 MW each. The contract was awarded in October 2011. The availability factor was 95% and the utilization factor 29.75% (wind measurements). Senok received an equity investment from the IFC in May 2011 of $3.8 million.Total project cost for Mapuri 2 & 3 was estimated by IFC at $46 million. The project applied for UNFCCC CDM financing for levels one and two. Wind Farm 2: CDM documentation reports KLR 2,932 million, of which LKR 1620 million in debt and LKR 180 million in equtiy (60:40). Expected interest rate on debt was 16.89% The coordinates of the wind turbines (wind farm 2) are: WTG1 N 7° 58’ 33.3” E 79° 43’ 53.5” WTG2 N 7° 58’ 23.3” E 79° 43’ 56.6” WTG3 N 7° 58’ 07.0” E 79° 44’ 01.9” WTG4 N 7° 58’ 52.35” E 79° 44’ 23.31” WTG5 N 7° 59’ 04.4” E 79° 44’ 15.3” www.senoksl.com http://www.ifc.org/ifcext/spiwebsite1.nsf/0/C834208AAA7BFC7D85257856005FCC5F http://www.greenon.lk/?p=59 http://www.lankabusinessonline.com/fullstory.php?nid=1223352553 http://ifcext.ifc.org/ifcext/southasia.nsf/content/SelectedPRIndia?OpenDocument&UNID=D73A7B961628F0D8852578AA005AD1E9 The Press Trust of India Limited: Suzlon Bags order from Sri Lankan Co (11 October 2011). http://cdm.unfccc.int/filestorage/2/x/WM2EKRAZ05SD3IQ8HBC9YFXUJO7T4L.pdf/PDD.pdf?t=VUN8bWV4b3A0fDAjTVs0QqEm0twE34KA7myn

Original sector

Energy

Budget

Location

Country

Sri Lanka

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Car parking, Wind, Raw Materials, Power Transmission, Government, Power Generation (CCGT), Automotive, Commercial

Article published date

2024-09-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project