Senqu Bridge
Sector: Bridge • Location: Mokhotlong, Lesotho
Source: Mabumbe
The Senqu Bridge is the first extradosed bridge in Lesotho, part of Phase II of the Lesotho Highlands Water Project (LHWP). It is a major infrastructure investment designed to improve connectivity across the mountainous region, strengthen transport, economic integration, and bilateral cooperation between Lesotho and South Africa. The bridge stretches approximately 825 meters and rises about 90 met
- Status
- Closed
- Sector
- Bridge, Water Supply and Storage
- Location
- Mokhotlong, Lesotho
- Updated
- 22 Jul 2026
- Source
- Mabumbe
ConstructChat
Ask ConstructChat about Senqu Bridge
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Senqu Bridge is the first extradosed bridge in Lesotho, part of Phase II of the Lesotho Highlands Water Project (LHWP). It is a major infrastructure investment designed to improve connectivity across the mountainous region, strengthen transport, economic integration, and bilateral cooperation between Lesotho and South Africa. The bridge stretches approximately 825 meters and rises about 90 meters above the river valley, positioned more than 2,500 meters above sea level for durability and long-term service. |
Original sector | Infrastructure |
Budget |
Location
Country | Lesotho |
City | Mokhotlong |
Source
Source | Mabumbe |
URL |
More Details
Record type | Project |
Sector | Bridge, Water Supply and Storage |
Article published date | 2026-04-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
