Senqu Bridge
Sector: Hydro • Location: Mokhotlong, Lesotho
Source: Freight News
The Senqu Bridge is the first extradosed bridge in Lesotho, combining cable-stayed and prestressed girder design. It is part of Phase II of the Lesotho Highlands Water Project (LHWP) and provides a vital transport link across the Polihali Reservoir, maintaining connectivity to the national road network via the A1 route, linking Mokhotlong to Maseru. The bridge ensures uninterrupted access to key a
- Status
- Closed
- Sector
- Hydro, Water Supply and Storage, Bridge, Road
- Location
- Mokhotlong, Lesotho
- Updated
- 22 Jul 2026
- Source
- Freight News
ConstructChat
Ask ConstructChat about Senqu Bridge
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Senqu Bridge is the first extradosed bridge in Lesotho, combining cable-stayed and prestressed girder design. It is part of Phase II of the Lesotho Highlands Water Project (LHWP) and provides a vital transport link across the Polihali Reservoir, maintaining connectivity to the national road network via the A1 route, linking Mokhotlong to Maseru. The bridge ensures uninterrupted access to key areas even after existing routes are submerged by the Polihali Dam. |
Original sector | Infrastructure |
Budget |
Location
Country | Lesotho |
City | Mokhotlong |
Source
Source | Freight News |
URL |
More Details
Record type | Project |
Sector | Hydro, Water Supply and Storage, Bridge, Road |
Article published date | 2026-04-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
