Senqu Bridge
Sector: Water Supply and Storage • Location: Mokhotlong, Lesotho
Source: Business Tech
The Senqu Bridge is a major infrastructure project completed as part of Phase II of the Lesotho Highlands Water Project. It is an 825-metre-long and 90-metre-high extradosed bridge designed to maintain transport connectivity across the Polihali Reservoir in Lesotho. The bridge supports regional integration and water security by ensuring uninterrupted access to key areas despite rising water levels
- Status
- Closed
- Sector
- Water Supply and Storage, Hydro, Bridge, Government
- Location
- Mokhotlong, Lesotho
- Updated
- 22 Jul 2026
- Source
- Business Tech
ConstructChat
Ask ConstructChat about Senqu Bridge
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Senqu Bridge is a major infrastructure project completed as part of Phase II of the Lesotho Highlands Water Project. It is an 825-metre-long and 90-metre-high extradosed bridge designed to maintain transport connectivity across the Polihali Reservoir in Lesotho. The bridge supports regional integration and water security by ensuring uninterrupted access to key areas despite rising water levels from the Polihali Dam. |
Original sector | Water Infrastructure |
Budget |
Location
Country | Lesotho |
City | Mokhotlong |
Source
Source | Business Tech |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Hydro, Bridge, Government |
Article published date | 2026-04-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
