Senqu Bridge
Sector: Water Supply and Storage • Location: Lesotho
Source: Nova News
The Senqu Bridge is an 825-metre long bridge standing 90 metres high, constructed as part of Phase II of the Lesotho Highlands Water Project. It replaces an existing bridge that will be submerged once the Polihali Dam is filled, ensuring continued access to Mokhotlong, Sani Pass, and surrounding areas. The bridge is the largest of three bridges spanning the Polihali Reservoir and was built at a co
- Status
- Closed
- Sector
- Water Supply and Storage, Hydro, Bridge, Government
- Location
- Lesotho
- Updated
- 22 Jul 2026
- Source
- Nova News
ConstructChat
Ask ConstructChat about Senqu Bridge
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Senqu Bridge is an 825-metre long bridge standing 90 metres high, constructed as part of Phase II of the Lesotho Highlands Water Project. It replaces an existing bridge that will be submerged once the Polihali Dam is filled, ensuring continued access to Mokhotlong, Sani Pass, and surrounding areas. The bridge is the largest of three bridges spanning the Polihali Reservoir and was built at a cost of approximately R2.4 billion. |
Original sector | Water Infrastructure |
Budget |
Location
Country | Lesotho |
Source
Source | Nova News |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Hydro, Bridge, Government |
Article published date | 2026-04-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
