Senqu Bridge
Sector: Hydro • Location: Mokhotlong, Lesotho
Source: The Mail & Guardian
The Senqu Bridge is an 825-metre extradosed cable-stayed structure spanning a deep gorge in the Mokhotlong District of Lesotho. It was constructed as part of Phase II of the Lesotho Highlands Water Project (LHWP) to replace an existing crossing that will be submerged by the Polihali Dam reservoir. The bridge was built at an estimated cost of R2.4 billion and is celebrated as the largest and most t
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Senqu Bridge is an 825-metre extradosed cable-stayed structure spanning a deep gorge in the Mokhotlong District of Lesotho. It was constructed as part of Phase II of the Lesotho Highlands Water Project (LHWP) to replace an existing crossing that will be submerged by the Polihali Dam reservoir. The bridge was built at an estimated cost of R2.4 billion and is celebrated as the largest and most technically ambitious bridge ever built in Lesotho. The project has faced criticism for failing to adequately compensate and relocate affected communities, particularly in Sekokong, where homes were damaged by construction blasting. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
