Sephora Building
Sector: Power Generation (CCGT) • Location: Nashville, Tennessee, United States of America
Source: Dodge USA
MINOR REMODEL OF EXISTING TENANT SPACE TO INCLUDE NEW SALES AREA FIXTURES, FLOOR FINISHES AND ELECTRICAL REWORK AS REQURIED FOR NEW FIXTURES INTERIOR RENOVATION, NO EXPANSION OF BUILDING FOOTPRINT. POC: ALEX RAYMOND 925.585.1785
- Status
- Prospective
- Sector
- Power Generation (CCGT), Manufacturing (Industrial), Commercial
- Location
- Nashville, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sephora Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | MINOR REMODEL OF EXISTING TENANT SPACE TO INCLUDE NEW SALES AREA FIXTURES, FLOOR FINISHES AND ELECTRICAL REWORK AS REQURIED FOR NEW FIXTURES INTERIOR RENOVATION, NO EXPANSION OF BUILDING FOOTPRINT. POC: ALEX RAYMOND 925.585.1785 |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Nashville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Manufacturing (Industrial), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
