Septic to Sewer Phase 2
Sector: Water Supply and Storage • Location: Orange Park, Florida, United States of America
Source: Dodge USA
The scope of work includes construction small force mains, valves, check valves, direction drilling, installation of grinder pumping stations, related modifications to the electrical systems on the properties, and pumping/abandonment of existing septic tanks. Connections will be made in the Town rights-of-way are points previously constructed during Phase 1 of this project.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The scope of work includes construction small force mains, valves, check valves, direction drilling, installation of grinder pumping stations, related modifications to the electrical systems on the properties, and pumping/abandonment of existing septic tanks. Connections will be made in the Town rights-of-way are points previously constructed during Phase 1 of this project. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
