Sequitor Edge Data Center
Sector: Water Supply and Storage • Location: Rapid City, South Dakota, USA
Source: KOTA Territory News
Sequitor Edge plans to construct a data center in the Black Hills Industrial Center on Rapid City's south side, south of Old Folsom Road and east of Highway 79. The facility would initially use about 2 megawatts of power and could expand to 10 megawatts, utilizing a closed-loop cooling system to minimize water consumption.
- Status
- Prospective
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Data Center, Power Generation (CCGT), Road
- Location
- Rapid City, South Dakota, United States of America
- Updated
- 19 Nov 2026
- Source
- KOTA Territory News
ConstructChat
Ask ConstructChat about Sequitor Edge Data Center
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Sequitor Edge plans to construct a data center in the Black Hills Industrial Center on Rapid City's south side, south of Old Folsom Road and east of Highway 79. The facility would initially use about 2 megawatts of power and could expand to 10 megawatts, utilizing a closed-loop cooling system to minimize water consumption. |
Original sector | Technology |
Location
Country | United States of America (USA) |
State | South Dakota |
City | Rapid City |
Source
Source | KOTA Territory News |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Data Center, Power Generation (CCGT), Road |
Article published date | 2026-08-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
