logo

Sequoia Solar Farm

Sector: Solar • Location: Texas, United States

Source: Engineering News-Record

Project
Planned

The Sequoia Solar Farm is a $1.1 billion non-building project located in Callahan County, Texas. It is the largest non-building project to start in January 2025, contributing to the growth in utility and renewable energy infrastructure.

Status
Prospective
Sector
Solar, Commercial, Raw Materials, Power Transmission, Power Generation (CCGT)
Location
Texas, United States of America
Updated
22 Jul 2026
Source
Engineering News-Record

ConstructChat

Ask ConstructChat about Sequoia Solar Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Sequoia Solar Farm” is an infrastructure initiative in the Solar sector, located in Texas, United States. Taiyo aggregates data on it from Engineering News-Record.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Sequoia Solar Farm is a $1.1 billion non-building project located in Callahan County, Texas. It is the largest non-building project to start in January 2025, contributing to the growth in utility and renewable energy infrastructure.

Original sector

Non-Building

Budget

Location

Country

United States of America (USA)

State

Texas

Source

Source

Engineering News-Record

URL

More Details

Record type

Project

Sector

Solar, Commercial, Raw Materials, Power Transmission, Power Generation (CCGT)

Article published date

2025-03-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project