Sequoyah NWR Water Control Structure Replacement Project
Sector: Water Supply and Storage • Location: United States of America
Source: Grants.gov
The goal of this work is to survey, design, and purchase water control structures for Sequoyah National Wildlife Refuge. The project will include specifications for the purchase and installation of the water control structures. Similarly, engineering assistance, material purchase, and assistance in the construction phase (upon Service approval of design and construction plans) is necessary fo
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | archived |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The goal of this work is to survey, design, and purchase water control structures for Sequoyah National Wildlife Refuge. The project will include specifications for the purchase and installation of the water control structures. Similarly, engineering assistance, material purchase, and assistance in the construction phase (upon Service approval of design and construction plans) is necessary for the fulfillment of this project. The primary objective of this project is to provide engineering support for the replacement of twenty-seven (27) water control structures in several units Sequoyah National Wildlife Refuge near Vian, Oklahoma. The current water control structures are in poor condition and need to be replaced to provide the proper management of existing wetland units. Engineers will provide a set of stamped design drawings suitable for a bid package. Design drawings will include current topographic elevations and details for typical of water-control structure designs. Secondary objectives will include construction assistance on the installation of the water control structures. The overall work plan will be partitioned into 3 tasks as follows:Task 1: Document site topography and existing features of existing water control structures. Complete and deliver suitable construction plans with a preliminary design and cost estimate needed to achieve project objective.Task 2: Provide a final set of sealed engineering plans suitable for the purchase and installation of the water control structures. Solicit bids for the water control structure materials. Review the bids and submit the bids to the FWS staff for approval.Task 3: Purchase water control structure materials. Provide construction inspection during the installation of the water control structures. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
