logo
ProjectArchived

Sequoyah NWR Water Control Structure Replacement Project

Sector: Water Supply and Storage • Location: United States of America

Source: Grants.gov

The goal of this work is to survey, design, and purchase water control structures for Sequoyah National Wildlife Refuge. The project will include specifications for the purchase and installation of the water control structures. Similarly, engineering assistance, material purchase, and assistance in the construction phase (upon Service approval of design and construction plans) is necessary fo

Status
Closed
Sector
Water Supply and Storage, Government, Education
Location
United States of America
Updated
22 Jul 2026
Source
Grants.gov

ConstructChat

Ask ConstructChat about Sequoyah NWR Water Control Structure Replacement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Sequoyah NWR Water Control Structure Replacement Project” is an infrastructure initiative in the Water Supply and Storage sector, located in United States of America. Taiyo aggregates data on it from Grants.gov.

Participants

Sponsoring Agency

Status

Original status

archived

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The goal of this work is to survey, design, and purchase water control structures for Sequoyah National Wildlife Refuge. The project will include specifications for the purchase and installation of the water control structures. Similarly, engineering assistance, material purchase, and assistance in the construction phase (upon Service approval of design and construction plans) is necessary for the fulfillment of this project. The primary objective of this project is to provide engineering support for the replacement of twenty-seven (27) water control structures in several units Sequoyah National Wildlife Refuge near Vian, Oklahoma. The current water control structures are in poor condition and need to be replaced to provide the proper management of existing wetland units. Engineers will provide a set of stamped design drawings suitable for a bid package. Design drawings will include current topographic elevations and details for typical of water-control structure designs. Secondary objectives will include construction assistance on the installation of the water control structures. The overall work plan will be partitioned into 3 tasks as follows:Task 1: Document site topography and existing features of existing water control structures. Complete and deliver suitable construction plans with a preliminary design and cost estimate needed to achieve project objective.Task 2: Provide a final set of sealed engineering plans suitable for the purchase and installation of the water control structures. Solicit bids for the water control structure materials. Review the bids and submit the bids to the FWS staff for approval.Task 3: Purchase water control structure materials. Provide construction inspection during the installation of the water control structures.

Budget

Location

Country

United States of America (USA)

Source

Source reliability

High

Source

Grants.gov

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Education

Article published date

2023-06-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project