Sermsang Khushig Khundii Solar PV Power Plant
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The project involves the construction, operation and maintenance of a 15 MW solar power plant in Khushig valley, Tuv aimag in Mongolia. In addition, it will also include the construction of a 110/10kV substation, a 14-km long 110kV double circuit overhead electricity transmission line, and extension of the 110/10kV Khushig substation owned by the National Power Transmission Grid SOJSC. The SPV Te
- Status
- Prospective
- Sector
- Solar, Wind, Power Generation (CCGT), Government, Manufacturing (Industrial), Power Transmission, Commercial
- Location
- Mongolia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Sermsang Khushig Khundii Solar PV Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the construction, operation and maintenance of a 15 MW solar power plant in Khushig valley, Tuv aimag in Mongolia. In addition, it will also include the construction of a 110/10kV substation, a 14-km long 110kV double circuit overhead electricity transmission line, and extension of the 110/10kV Khushig substation owned by the National Power Transmission Grid SOJSC. The SPV Tenuun Gerel Construction LLC is owned by the sponsors - Sermsang Power Corporation Public Company Ltd (Thailand) with 75%, Sharp Energy Solutions Corporation (Japan) with 10%, and AMOE Solar LLC (Mongolia) with 10 % and SH Energy Solution LLC (Mongolia) with 5%. The SPV has entered into a power purchase agreement (PPA) with the National Dispatching Center LLC (NDC), a government-owned utility and single purchaser of electricity generated by power producers in Mongolia. Asian Development Bank (ADB) is providing $ 9.6 million from own resources and 9.1 million from Leading Asia's Private Infrastructure Fund (LEAP). Financial close was announced on 20 March 2019. The project is expected to generate22.3 GWh of electricity annually and reduce CO2 emissions by 26,400 tons per year. https://www.adb.org/news/adb-supports-private-sector-solar-power-development-mongolia https://www.adb.org/projects/52127-001/main#project-pds https://www.adb.org/sites/default/files/project-documents/52127/52127-001-rrp-en.pdf https://ijglobal.com/articles/138823/mongolian-wind-pulls-in-support https://ijglobal.com/data/transaction/45857/sermsang-khushig-khundii-skk-solar-pv-plant-15mw |
Original sector | Energy |
Budget |
Location
Country | Mongolia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Solar, Wind, Power Generation (CCGT), Government, Manufacturing (Industrial), Power Transmission, Commercial |
Article published date | 2024-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
