Serra Azul Wind Park
Sector: Commercial • Location: Brazil
Source: World Bank Group
Enel Green Power Dois Riachos Eolica S.A., Enel Green Power Damascena Eolica S.A., and Enel Green Power Manicoba Eolica S.A., subsidiaries of the Italian company Enel Green Power, were granted authorizations to build three wind power plants located in the municipality of Cafarnaum, state of Bahia (90 MW in total capacity). The power plants were named EOL Dois Riachos, EOL Damascena and EOL Manico
- Status
- Prospective
- Sector
- Commercial, Wind, Cable car, Car parking, Power Generation (CCGT), Steel, Government, Automotive, Manufacturing (Industrial), Telecommunications
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Serra Azul Wind Park
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Enel Green Power Dois Riachos Eolica S.A., Enel Green Power Damascena Eolica S.A., and Enel Green Power Manicoba Eolica S.A., subsidiaries of the Italian company Enel Green Power, were granted authorizations to build three wind power plants located in the municipality of Cafarnaum, state of Bahia (90 MW in total capacity). The power plants were named EOL Dois Riachos, EOL Damascena and EOL Manicoba, each with 30 MW in capacity. The 35-year contracts were signed with the regulatory agency ANEEL starting in May 2013. The total investment in the power plants was estimated at US$ 142 million (BRL 422.7 million). The government periodically runs public bidding for the sale of energy to the country´s distribution companies. The power plants controlled by Enel won the public bidding that took place in December 2012 and August 2013 by offering an average tariff of US$ 30 /MWh (BRL 89,20/MWh) and US$ 33.8 /MWh (BRL 100,60/MWh), respectively. The project companies signed 20 -year power purchase agreements with the several electricity distribution companies. The companies committed to start supplying to the market in 2015 (EOL Damascena and EOL Manicoba) and in 2017 (EOL Dois Riachos). In December 2013, the IFC approved a US$ 220 million A-loan to finance five of Enel's wind parks in Brazil: Modelo, Serra Azul, Fonte dos Ventos, Cristal and Curva dos Ventos. Information on how much of this funding was directed to each project was not released. Construction works commenced in September 2015, and were in its final stages by June 2015. In December 2015, the state-owned bank BNDES approved a loan of US$ 41.6 million (BRL 138.7 million). The projects was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures. Finally, the electricity sold by the company is not subject to sector taxes. In January 2012, the company applied for carbon credits. In February 2016, the project companies issued US$ 16.6 million in long-term bonds to refinance previous debts. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Wind, Cable car, Car parking, Power Generation (CCGT), Steel, Government, Automotive, Manufacturing (Industrial), Telecommunications |
Article published date | 2024-05-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia
