logo

Serra do Assurua Wind Complex Phase 2 (846MW)

Sector: Wind • Location: Brazil

Source: World Bank Group

Project
Active

"Phase 2 of the Serra do Assuruá Wind Complex involves the construction of this onshore wind facility, located in the municipality of Gentio do Ouro, in Bahia state, Brazil. The sponsor for this initiative is Engie Group. The total investment for this phase amounts to $638.21 million (R$3.5 billion), secured through a debenture issuance by the sponsor company. The issuance was arranged by Santande

Project Information FAQ

Project Information

4 Q
The project “Serra do Assurua Wind Complex Phase 2 (846MW)” is an infrastructure initiative in the Wind sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

"Phase 2 of the Serra do Assuruá Wind Complex involves the construction of this onshore wind facility, located in the municipality of Gentio do Ouro, in Bahia state, Brazil. The sponsor for this initiative is Engie Group. The total investment for this phase amounts to $638.21 million (R$3.5 billion), secured through a debenture issuance by the sponsor company. The issuance was arranged by Santander, Itaú BBA, Bradesco, Banco Votorantim, Banco Safra, and Banco ABC Brasil, with a 10-year tenor and a maturity date set for July 2034. The proceeds will be used to reimburse investments made in the implementation of the Serra do Assuruá Wind Project. The financial closure for these debenture issuances occurred on July 2 and in October 2024." https://x.realfin.com/transaction/259860/serra-de-assurua-wind-complex-846mw-debenture-2024-july ; https://x.realfin.com/transaction/269183/serra-de-assurua-wind-complex-846mw-debenture-2024 ; https://www.engie.com.br/wp-content/uploads/2024/07/04-Engie-Anuncio-de-Inicio-Publicado.pdf ; https://www.engie.com.br/wp-content/uploads/2024/06/FRE-EBE-2024.11.11-V7-eng.pdf ; https://www.engie.com.br/wp-content/uploads/2024/06/240605-Material-Fact-12nd-Debentures-Issuance.pdf ; https://www.fitchratings.com/research/pt/corporate-finance/fitch-assigns-aaa-bra-to-engie-brasils-13th-debenture-purpose-23-09-2024

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data