logo

Serra do Facao Power Plant

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Active

Energetica Ltda and Votorantim Cimentos Ltda, was awarded in a competitive bidding process the contract to build and operate a 212.58 MW hydro power plant located in the Sao Marcos River, state of Goias. Information on the other bidders was not available.

The bidding criteria set by the regulatory agency ANEEL was the highest price paid for the concession rights. GEFAC presented the highest of

Status
Prospective
Sector
Commercial, Power Generation (CCGT), Hydro, Cement, Government
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Serra do Facao Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Serra do Facao Power Plant” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Energetica Ltda and Votorantim Cimentos Ltda, was awarded in a competitive bidding process the contract to build and operate a 212.58 MW hydro power plant located in the Sao Marcos River, state of Goias. Information on the other bidders was not available. The bidding criteria set by the regulatory agency ANEEL was the highest price paid for the concession rights. GEFAC presented the highest offer, $38.1-million ($16.56-million) in annual concession fees, 3190% above the minimum value set by the regulatory agency. This value was set to be paid in monthly installments between the 7th and 35th years of the concession contract. The net present value of such concession fees in 2001 (when the contract was signed were estimated at US$176 million). The contract was signed in November 2001, and sponsors created the company Serra do Facao Hidreletrica S.A. to lead the project during the 35-year contract period. As of 2009, ownership of the project company was structured as follows: Furnas Centrais Eletricas (49.47%), Alcoa (34.97%), Camargo Correa (10.09%) and state-owned DME Energética (5.47%). In October 2007, Serra do Facao Hidreletrica committed to sell 121 MW to the regulated market and 66 MW to Alcoa under the same pricing conditions. In February 2007, the service order for construction and equipment supply was signed with Consorcio de Empresas Fornecedoras de Serra do Facao (COFAC) so that construction works could commence. COFAC was comprised by Construcoes e Comercio Camargo Correa S.A. (responsible for the civil works); Voith Siemens (responsible for equipment supply); and CNEC (responsible for executive project execution). The sponsor committed to invest US$ 531.5 million (BRL 1.063 billion) in the power plant. Although initial construction works commenced in 2007, financial closure was only achieved in April 2009, when the sponsor signed a US$ 260 million (BRL 520 million) loan contract with BNDES (the loan was initially approved in 2007, but the contract was only signed in April 2009 and the bank started releasing the funds in May 2009). In February 2010, BNDES approved another loan to the project company amounting to US$ 31.2 million (BRL 56.1 million). The remaining cost was set to be financed with the sponsors’ internal resources. Commercial operations of the first generating unit (106.2 MW) started in July 2010.

Original sector

Energy

Procurement method

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Hydro, Cement, Government

Article published date

2024-09-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project