In May 2009, the Brazilian company CTEEP was awarded in a competitive bidding process the contract to build and operate two substations in the state of Sao Paulo. Besides CTEEP, eight companies took part in the contest, though only two participated in the final stage of the process, besides CTEEP: Consorcio Transenergia (the Brazilian company J.Malucelli; state-owned Furnas; the Brazilian company

Project Information FAQ

Project Information

4 Q
The project “Serra do Japi Transmission Line” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In May 2009, the Brazilian company CTEEP was awarded in a competitive bidding process the contract to build and operate two substations in the state of Sao Paulo. Besides CTEEP, eight companies took part in the contest, though only two participated in the final stage of the process, besides CTEEP: Consorcio Transenergia (the Brazilian company J.Malucelli; state-owned Furnas; the Brazilian company Delta); and the Brazilian company Empresa Amazonense de Transmissao de Energia S.A. ENERGIA S.A. The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. CTEEP presented the lowest offer, a value of US$ 10.9 million (BRL 21.8 million), 11.02% below the ceiling set by the regulatory agency. The contract was signed in November 2009, and the sponsors created the company Serra do Japi S.A. to lead the project during the 30-year contract period. The sponsor committed to invest US$ 90 million (BRL 180 million) in the transmission line. The construction works commenced in 2010. In July 2011, the sponsor was granted a US$ 20 million (BRL 40 million) loan from the state-owned bank Banco do Brasil. In October 2011, the state-owned bank BNDES granted a US$ 57.2 million (BRL 93.4 million) loan to the project. The remaining cost was set to be financed with the sponsors’ internal resources. Construction works were expected to be concluded by November 2011. Operations commenced in September 2012.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date