In May 2009, the Brazilian company CTEEP was awarded in a competitive bidding process the contract to build and operate two substations in the state of Sao Paulo. Besides CTEEP, eight companies took part in the contest, though only two participated in the final stage of the process, besides CTEEP: Consorcio Transenergia (the Brazilian company J.Malucelli; state-owned Furnas; the Brazilian company

Status
Prospective
Sector
Commercial, Power Generation (CCGT), Government
Location
Sao Paulo, Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Serra do Japi Transmission Line

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Serra do Japi Transmission Line” is an infrastructure initiative in the Commercial sector, located in Sao Paulo, Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In May 2009, the Brazilian company CTEEP was awarded in a competitive bidding process the contract to build and operate two substations in the state of Sao Paulo. Besides CTEEP, eight companies took part in the contest, though only two participated in the final stage of the process, besides CTEEP: Consorcio Transenergia (the Brazilian company J.Malucelli; state-owned Furnas; the Brazilian company Delta); and the Brazilian company Empresa Amazonense de Transmissao de Energia S.A. ENERGIA S.A. The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. CTEEP presented the lowest offer, a value of US$ 10.9 million (BRL 21.8 million), 11.02% below the ceiling set by the regulatory agency. The contract was signed in November 2009, and the sponsors created the company Serra do Japi S.A. to lead the project during the 30-year contract period. The sponsor committed to invest US$ 90 million (BRL 180 million) in the transmission line. The construction works commenced in 2010. In July 2011, the sponsor was granted a US$ 20 million (BRL 40 million) loan from the state-owned bank Banco do Brasil. In October 2011, the state-owned bank BNDES granted a US$ 57.2 million (BRL 93.4 million) loan to the project. The remaining cost was set to be financed with the sponsors’ internal resources. Construction works were expected to be concluded by November 2011. Operations commenced in September 2012.

Original sector

Energy

Budget

Location

Country

Brazil

State

Sao Paulo

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Government

Article published date

2024-05-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project