Serra Mesa Improv 1
Sector: Waste Processing and Treatment • Location: San Diego, California, United States of America
Source: Dodge USA
This project consists of trenchless rehabilitation of approximately 5,786 LF (1.10 miles) of existing 8-inch and 10-inch Sewer Mains, including approximately rehabilitation of 22 Manholes, 2 Point Repairs, Installation of 8 Cleanouts, and rehabilitation of all associated Sewer Laterals (approximately 117) from the Sewer Main to the property line and installation of Sewer Lateral cleanouts as neede
- Status
- Closed
- Sector
- Waste Processing and Treatment, Commercial, Water Supply and Storage, Government, Manufacturing (Industrial)
- Location
- San Diego, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Serra Mesa Improv 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of trenchless rehabilitation of approximately 5,786 LF (1.10 miles) of existing 8-inch and 10-inch Sewer Mains, including approximately rehabilitation of 22 Manholes, 2 Point Repairs, Installation of 8 Cleanouts, and rehabilitation of all associated Sewer Laterals (approximately 117) from the Sewer Main to the property line and installation of Sewer Lateral cleanouts as needed to complete the lateral lining work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Diego |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Commercial, Water Supply and Storage, Government, Manufacturing (Industrial) |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Laguna Canyon Road , Road Improvements ( Segment 4 ) ( Phases 2 to 4 )
- Panorama Heights Drainage and Road Improvements
- Modjeska Grade Road , Road and Drainage Improvements
- Street Drainage Improvements ( Annual )
- Barrett Lane Drainage and Sidewalk Improvement
- Ronald Caspers Wilderness Park - Maintenance Building - Renovation
- West Bay Yards
